MEC18-05484
| Final | 1/10/2019 | 1/11/2019 | 1/11/2019 4:11:18 PM | P | PASS |
|
|
Not home until after 3pm // Debbie // Contractor is Kim at Access Heathing ###-#### Phone #: ###-####- furnace co ok
|
MEC18-05962
| Final | 1/9/2019 | 1/11/2019 | 1/11/2019 3:46:50 PM | P | FAIL |
|
|
Please call client prior to arrival at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Andrea Grigsby- need to seal line set penetration- need arma flex inside garage at floor level a/c side bare copper exposed- bubble wrap insulation needs 3/4" air gas to maintain R-6 value-
|
MEC19-00111
| Final | 1/11/2019 | 1/11/2019 | 1/11/2019 3:16:04 PM | P | PASS |
|
|
|
MEC19-00111
| Pressure Test | 1/11/2019 | 1/11/2019 | 1/11/2019 3:15:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Justin Osterhout- 20lb gas pass- co installed
|
MEC18-05500
| Final | 1/11/2019 | 1/11/2019 | 1/11/2019 2:54:29 PM | P | PASS |
|
|
Tim Phone #: ###-####- final ok
|
MEC18-05698
| Rough-in | 1/11/2019 | 1/11/2019 | 1/11/2019 2:28:48 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Terek Worley- R/I ok
|
MEC18-04195
| Final | 1/10/2019 | 1/11/2019 | 1/11/2019 1:50:03 PM | P | PASS |
|
|
call home owner before coming ###-#### Inspection requested via web by Kim Lithander- a/c coil co ok
|
MEC19-00142
| Final | 1/10/2019 | 1/11/2019 | 1/11/2019 1:19:08 PM | P | PASS |
|
|
INSTALLER TRAVIS ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace only co ok
|
MEC18-05976
| Final | 1/11/2019 | 1/11/2019 | 1/11/2019 1:02:10 PM | P | PASS |
|
|
final ok- no card onsite to sign
|
MEC18-03793
| Final | 1/11/2019 | 1/11/2019 | 1/11/2019 12:54:55 PM | P | CANC |
|
|
Final for gas-piping only. Our scope did not include installation or the connection of any appliances. Please call Katie 1/2 hr. in advance - ###-####. Phone #: ###-#### Inspection requested via web by Bryan Palmer- rescheduled for monday pm
|
MEC18-04506
| Final | 1/10/2019 | 1/11/2019 | 1/11/2019 11:50:12 AM | A | PASS |
|
|
Your site contact will be Dave Godfrey. Thanks! Phone #: ###-#### Inspection requested via web by RM Mechanical- final ok- fire/smoke dampers labeled- card signed
|
MEC19-00134
| Pressure Test | 1/10/2019 | 1/11/2019 | 1/11/2019 11:28:47 AM | A | PART |
|
|
Anytime Inspection requested via web by Floyd Floyd Peek- 20lb gas pass mobile home only- no meter set yet will need to retest whole system when uinderground is ran
|
MEC19-00133
| Pressure Test | 1/10/2019 | 1/11/2019 | 1/11/2019 11:27:51 AM | A | PART |
|
|
Inspection requested via web by Floyd Floyd Peek- 20lb gas pass to mobile home only- need meter set and piped from meter to mobile home and retest whole system
|
MEC18-05912
| Final | 1/8/2019 | 1/11/2019 | 1/11/2019 10:54:08 AM | A | PASS |
|
|
This is a Flue Pressure and Final Inspect. Please meet our installer at home at 9:00 AM. Contact for Right Now is Mary ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok- 5lb flue pass
|
MEC18-05721
| Final | 1/10/2019 | 1/11/2019 | 1/11/2019 10:31:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- furnace a/c coil co ok
|
MEC19-00104
| Final | 1/10/2019 | 1/11/2019 | 1/11/2019 10:01:01 AM | A | PASS |
|
|
our techs will be onsite in the am Please call Cody Tech ###-#### homeowner Larry ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake- Furnace a/c coil co ok
|
MIS19-00004
| DOC - Permit Finaled | 1/11/2019 | 1/11/2019 | 1/11/2019 9:43:14 AM | A | PASS |
|
|
|
MEC19-00114
| Final | 1/9/2019 | 1/11/2019 | 1/11/2019 9:20:47 AM | A | PASS |
|
|
Call ahead to Mark at ###-#### when in route Phone #: ###-#### Inspection requested via web by Sabrina DeHority- furnace a/c coil co ok
|
MEC19-00114
| Pressure Test | 1/9/2019 | 1/11/2019 | 1/11/2019 9:19:45 AM | A | CANC |
|
|
Call ahead to Mark at ###-#### when in route Phone #: ###-#### Inspection requested via web by Sabrina DeHority- not needed
|
MEC19-00116
| Final | 1/11/2019 | 1/11/2019 | 1/11/2019 8:50:07 AM | A | PASS |
|
|
co installed- gas piping and test ok
|
MEC19-00116
| Pressure Test | 1/10/2019 | 1/11/2019 | 1/11/2019 8:49:18 AM | A | PASS |
|
|
Please call Irene prior to arrival ###-#### Inspection requested via web by Arielle Hendricks- 20lb gas pass from meter to range location
|
MEC19-00055
| Final | 1/10/2019 | 1/11/2019 | 1/11/2019 8:28:52 AM | A | PASS |
|
|
Field super: Chad Robertson This is a Rental tenant Tiffanie Long ###-#### will only be home in the morning has to leave by 11:00am. hope you guys can make this happen, very hard to get them to be home. Thank-you. Phone #: ###-#### Inspection requested via web by Lisa Whitney- furnace a/c coil co ok
|
MEC19-00124
| Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 8:08:45 AM | A | PASS |
|
|
Dan Phone #: ###-####- fireplace R/I ok
|
MEC18-00063
| Mec-Aging Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 7:58:56 AM | | FAIL |
|
|
correction need made and called in for inspection
|
MEC17-04730
| Mec-Aging Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 7:57:52 AM | | FAIL |
|
|
contractor needs to schedule inspection if work was done
|
MEC18-00089
| Mec-Aging Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 7:57:06 AM | | FAIL |
|
|
contractor needs to schedule inspection
|
MEC18-00060
| Mec-Aging Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 7:56:27 AM | | FAIL |
|
|
correction need made and recalled in for final inspection
|
MEC18-00095
| Mec-Aging Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 7:55:32 AM | | CANC |
|
|
|
MEC18-00095
| DOC - Permit Expired | 1/11/2019 | 1/11/2019 | 1/11/2019 7:55:08 AM | A | PASS |
|
|
this permit is voided- was done under mec18-00070- 2 permit pulled by same contractor at this address
|