BLD99-02391
| BLD-Framing/Rough-in | 1/11/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | A | FAIL |
|
|
dale--- ###-#### fr insp. 342's area; C/N: shear wall nailing, truss gussets.. (eng's).
|
BLD99-03008
| BLD-Final | 1/11/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/11/2000 at 16:42:48. Contact: ###-####. 407's area; handrail, clearance @ toilet.
|
MEC00-00101
| Final | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/12/2000 at 06:15:58. Contact: ###-####. Unable to contact; sent to Russ 407's area.
|
BLD99-01785
| BLD-Framing/Rough-in | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | A | PART |
|
|
Lowe's- canopy's- complete sheathing WIP.
|
BLD00-00022
| BLD-Conference | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PASS |
|
|
Met w/fire dept. & bldg. facilities mgr. need further research w/plan review. 1hr. corridor appears to have been breached at "new" opening.
|
BLD99-03301
| BLD-Final | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | FAIL |
|
|
###-#### JEFF. No access (homeowner left?).
|
BLD99-02806
| BLD-Framing/Rough-in | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PART |
|
|
ceiling grid tim ###-####. Chk. Seismic @ final, ok to continue (grid).
|
BLD99-03096
| BLD-Footing | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PASS |
|
|
###-#### SHAWN. Int. ftgs for truss/hood support col's.
|
BLD99-03145
| BLD-Foundation | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/12/2000 at 10:57:15. Contact: ###-####. Spec. insp. Onsite.
|
BLD98-01495
| BLD-Conference | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PASS |
|
|
w/supt. need eng's letter & all ok's for final.
|