Inspections for the day of: Wednesday, January 12, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02391 BLD-Framing/Rough-in1/11/20001/12/20001/12/2000 12:00:00 AMAFAIL
dale--- ###-#### fr insp. 342's area; C/N: shear wall nailing, truss gussets.. (eng's).
BLD99-03008 BLD-Final1/11/20001/12/20001/12/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/11/2000 at 16:42:48. Contact: ###-####. 407's area; handrail, clearance @ toilet.
MEC00-00101 Final1/12/20001/12/20001/12/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/12/2000 at 06:15:58. Contact: ###-####. Unable to contact; sent to Russ 407's area.
BLD99-01785 BLD-Framing/Rough-in1/12/20001/12/20001/12/2000 12:00:00 AMAPART
Lowe's- canopy's- complete sheathing WIP.
BLD00-00022 BLD-Conference1/12/20001/12/20001/12/2000 12:00:00 AMPPASS
Met w/fire dept. & bldg. facilities mgr. need further research w/plan review. 1hr. corridor appears to have been breached at "new" opening.
BLD99-03301 BLD-Final1/12/20001/12/20001/12/2000 12:00:00 AMPFAIL
###-#### JEFF. No access (homeowner left?).
BLD99-02806 BLD-Framing/Rough-in1/12/20001/12/20001/12/2000 12:00:00 AMPPART
ceiling grid tim ###-####. Chk. Seismic @ final, ok to continue (grid).
BLD99-03096 BLD-Footing1/12/20001/12/20001/12/2000 12:00:00 AMPPASS
###-#### SHAWN. Int. ftgs for truss/hood support col's.
BLD99-03145 BLD-Foundation1/12/20001/12/20001/12/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/12/2000 at 10:57:15. Contact: ###-####. Spec. insp. Onsite.
BLD98-01495 BLD-Conference1/12/20001/12/20001/12/2000 12:00:00 AMPPASS
w/supt. need eng's letter & all ok's for final.