ELE00-00072
| Electrical Rough-In | 1/11/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | A | PASS |
|
|
###-#### BRANDON. Ele. R/I; perm/svc.
|
ELE99-03566
| Final | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/12/2000 at 10:40:14. Contact: ###-####. 2-subpanels; computer room.
|
ELE00-00075
| Rough-In Permanent Service | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PASS |
|
|
###-#### BILL. Ele. R/I; perm.svc.
|
ELE00-00104
| Rough-In Permanent Service | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PASS |
|
|
gary late pm ###-####. Ele R/I; perm/svc.
|
ELE99-04527
| Final | 1/12/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PASS |
|
|
Perm./svc.; corrections cleared as per J.Schmer. Meter/main service connection for power only.
|
ELE00-00038
| Electrical Rough-In | 1/11/2000 | 1/12/2000 | 1/12/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/11/2000 at 11:51:54. Contact: ###-####. Suite #201 kitchen remodel.
|