Inspections for the day of: Friday, January 12, 2001.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01797 BLD-Conference1/11/20011/12/20011/12/2001 12:00:00 AMAPASS
FOR CONF ROD-- ###-#### worked out occ wall septation of hotisy rm and dryer rm 1 hr wall configuration framing. 1/12/2001 9:33:51 AM
BLD00-01166 BLD-Final1/11/20011/12/20011/12/2001 12:00:00 AMAPASS
New hse. under construction - demolition of previous bldg. - please confirm - thanks, Cathy
BLD00-03090 BLD-Framing/Rough-in1/12/20011/12/20011/12/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/12/2001 at 08:31:16. Contact: ###-####. grage brace panels ok c/n added to posted c/n for truss pick up work and fire blk/ mec not approved for cover. 1/12/2001 2:03:17 PM
BLD00-03201 BLD-Framing/Rough-in1/12/20011/12/20011/12/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/12/2001 at 10:36:32. Contact: ###-####. exterior ok for perplan wall bracing design. exterior only. 1/12/2001 1:21:25 PM
BLD00-01262 BLD-Framing/Rough-in1/11/20011/12/20011/12/2001 12:00:00 AMPPART
mark-- ###-#### fr need truss engineering to justafy soffit overhang. is going to sheer interior for wall bracing provition. 1/12/2001 12:54:40 PM
BLD00-01563 BLD-Concrete1/10/20011/12/20011/12/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/10/2001 at 07:22:25. Contact: ###-####.placed with special insp. pending report. 1/12/2001 2:06:42 PM