Inspections for the day of: Friday, January 12, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01656 BLD-Final1/11/20011/12/20011/12/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/11/2001 at 11:33:30. Contact: ###-####. No access and no answer at contact #....Left note. 1/12/2001 9:24:18 AM
MEC00-04286 Final1/11/20011/12/20011/12/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/11/2001 at 11:35:54. Contact: ###-####.
BLD00-03661 BLD-Foundation1/11/20011/12/20011/12/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/11/2001 at 13:14:18. Contact: ###-####. Bsmnt walls OK 1/12/2001 10:30:46 AM
BLD00-01574 BLD-Final1/11/20011/12/20011/12/2001 12:00:00 AMAPART
Dave ###-#### OK for temp Occ. C/N...Obtain Perm occ status within 90 days of this notice. 1/12/2001 10:40:55 AM
BLD00-03699 BLD-Foundation1/11/20011/12/20011/12/2001 12:00:00 AMAPASS
###-####
BLD00-03703 BLD-Foundation1/11/20011/12/20011/12/2001 12:00:00 AMAPASS
###-####
BLD00-03661 BLD-Foundation1/12/20011/12/20011/12/2001 12:00:00 AMAPASS
Added by Inspector: 316 On 1/12/2001 10:58:05 AM
BLD00-01634 BLD-Framing/Rough-in1/12/20011/12/20011/12/2001 12:00:00 AMPPASS
###-#### DAve Frame OK except stairs....Will check a final. 1/12/2001 11:57:26 AM
BLD00-03642 BLD-Foundation1/12/20011/12/20011/12/2001 12:00:00 AMPPART
Lazaro ###-#### Bsmnt wall OK 1/12/2001 1:32:50 PM
BLD00-02770 BLD-Footing1/11/20011/12/20011/12/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/11/2001 at 16:13:36. Contact: ###-####. No one on site (snowing). 1:20 PM. 1/12/2001 1:41:16 PM