BLD00-02448
| BLD-Framing/Rough-in | 1/11/2001 | 1/12/2001 | 1/12/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-02888
| BLD-Final | 1/11/2001 | 1/12/2001 | 1/12/2001 12:00:00 AM | A | PASS |
|
|
Howard ###-#### the front door will be open
|
BLD00-01593
| BLD-Framing/Rough-in | 1/12/2001 | 1/12/2001 | 1/12/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 1/12/2001 11:27:00 AM ok to insulate
|
BLD00-02948
| BLD-Wall cover | 1/11/2001 | 1/12/2001 | 1/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 09:52:03. Contact: ###-####.
|
BLD00-01551
| BLD-Framing/Rough-in | 1/11/2001 | 1/12/2001 | 1/12/2001 12:00:00 AM | P | FAIL |
|
|
FR INSP ###-#### SHAWN ok to insulate c/n left on site fire blocking and point lodes 1/12/2001 3:26:41 PM
|
BLD00-02414
| BLD-Energy code compliance | 1/11/2001 | 1/12/2001 | 1/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 10:17:51. Contact: ###-####.
|
MEC00-04360
| Rough-in | 1/12/2001 | 1/12/2001 | 1/12/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 09:08:50. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/12/2001 at 09:12:14.
|
MEC00-04360
| Pressure Test | 1/12/2001 | 1/12/2001 | 1/12/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 09:09:15. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/12/2001 at 09:11:24.
|