Inspections for the day of: Monday, January 12, 2004.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00697 INSP-Final Inspection1/9/20041/12/20041/12/2004 12:00:00 AMACANC
Troy, Here is the inspection request that you asked me to send in. We will have Randy onsite at 8:00 am on Monday. Thanks.; Phone #: ###-#### Internet Inspection Request from: Jason Minnick
FIR03-00773 INSP-Sprinkler Rough-in/Hydro1/9/20041/12/20041/12/2004 12:00:00 AMAFAIL
Provide ceiling in the water heater room for the installation of the sprinkler pendant. Also the fire alarm panel that is monitoring the sprinkler system has a zone 7 trouble 1/12/2004 2:26:12 PM
FIR03-00558 INSP-Final Inspection1/12/20041/12/20041/12/2004 12:00:00 AMPPART
Second floor sprinklers are finaled in the T.I. area 1/12/2004 3:03:20 PM
FIR03-00794 INSP-Sprinkler Rough-in/Hydro1/12/20041/12/20041/12/2004 12:00:00 AMPPART
The 24 hour air test started at 2:30 with 41 lbs. Overhead dry system is ok to cover. Riser and crawl space needs to be inspected. Contractor will provide sheet rock to separate the canopies from the main floor sprinkler system 1/12/2004 4:08:50 PM
BLD03-02979 FIRE-Final Inspection1/12/20041/12/20041/12/2004 12:00:00 AMPPASS
life safety finaled 1/12/2004 11:43:42 AM
FIR03-00505 INSP-Conference1/12/20041/12/20041/12/2004 12:00:00 AMPDONE
I issued a citation to bill ramsey with Benchmark Electric for beginning instalation of the fire alarm system prior to having approved plans