Inspections for the day of: Thursday, January 12, 2006.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM05-04044 Final1/12/20061/12/20061/12/2006 4:24:08 PMPPASS
JOB CONTACT IS MIKE WEBB ###-####; Phone #: ###-#### Internet Inspection Request from: MARGGIE BUSS final ok with floor drain by water heater exposed.
MEC05-01503 Final1/11/20061/12/20061/12/2006 4:16:43 PMPDEFR
Phone #: ###-#### x111 Internet Inspection Request from: LINDA DORN set up an inspection for troy on this project. didn't have a record of the fireplaces ever getting inspected.
MEC06-00058 Final1/10/20061/12/20061/12/2006 3:25:23 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe
PLM06-00100 Water and/or Sewer1/12/20061/12/20061/12/2006 3:06:41 PMPNR
Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom repair service now, will recall when they replace it.
MEC06-00124 Pressure Test1/11/20061/12/20061/12/2006 2:42:23 PMPPASS
nate; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie moved gas in crawlspace from the back of the house to the north side test ok
PLM06-00001 Plumbing Rough-in1/12/20061/12/20061/12/2006 2:15:06 PMPPASS
Brandon Internet Inspection Request from: Brandon Rohricht
MEC06-00130 Pressure Test1/12/20061/12/20061/12/2006 1:43:04 PMPPART
Please call Chad with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel this was a test on the four gas lines on the east end of this building, piping in the walls only. tests ok.
MEC05-04257 Rough-in1/11/20061/12/20061/12/2006 9:44:51 AMAPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC06-00041 Rough-in1/11/20061/12/20061/12/2006 8:59:06 AMAFAIL
Scheduled by a contractor via Hello! on 1/11/2006 at 3:53:18 PM. Contact: ###-####. no venting information on the job, needs insulation shield at b-vent.
MEC05-02714 Final1/12/20061/12/20061/12/2006 8:36:54 AMAPASS
Scheduled by a contractor via Hello! on 1/12/2006 at 4:28:32 AM. Contact: ###-####.