BLD05-01962
| FIRE-Final Inspection | 1/11/2006 | 1/12/2006 | 1/12/2006 5:46:10 PM | P | PASS |
|
|
Construction meets specifications, however the Nitrogen Triflouride trailers have not been installed on the pad at this time.
|
BLD05-01961
| FIRE-Final Inspection | 1/11/2006 | 1/12/2006 | 1/12/2006 5:44:18 PM | P | PASS |
|
|
Construction meets specifications, however the Nitrogen Triflouride tube trailers have not been installed on the pad at this time.
|
FIR05-00608
| INSP-Alarm Testing | 1/12/2006 | 1/12/2006 | 1/12/2006 4:30:29 PM | P | PASS |
|
|
Fire alarm for the hood suppression system functioned properly under test conditions, inspection passed.
|
FIR05-00412
| INSP-Final Inspection | 1/12/2006 | 1/12/2006 | 1/12/2006 2:21:10 PM | P | PASS |
|
|
Corrections have been made and hood retest witnessed at a related previous inspection(no entry made at that time), permit finaled.
|
FIR05-00016
| INSP-Final Inspection | 1/12/2006 | 1/12/2006 | 1/12/2006 12:39:43 PM | P | PASS |
|
|
UG fire supply line finaled.
|
FIR06-00008
| INSP-Sprinkler Rough-in | 1/12/2006 | 1/12/2006 | 1/12/2006 12:36:25 PM | P | PART |
|
|
Overhead rough-in is acceptable for cover. No final until all ceiling tile and escutcheons are installed to facilitate heat collection and maintain the listing for the heads.
|
FIR05-00594
| INSP-Sprinkler Rough-in | 1/12/2006 | 1/12/2006 | 1/12/2006 11:53:05 AM | P | PART |
|
|
Inspected four restrooms on the first floor for overhead rough-in cover.
|
FIR05-00260
| INSP-Final Inspection | 1/12/2006 | 1/12/2006 | 1/12/2006 11:48:34 AM | P | PASS |
|
|
This was a combination inspection including an UG flush witness, overhead final inspection which was conducted while the supply was connected to the overhead, and a final alarm test. All items tested satisfactory, permit finaled.
|