BLD06-02741
| FIRE-Final Inspection | 1/11/2007 | 1/12/2007 | 1/12/2007 4:04:57 PM | P | PART |
|
|
A temporary occupancy was given with dave hannimans permission until the door from the conference room has been installed with approved hardware and the thumbturn is removed from the main exit.
|
FIR06-00829
| INSP-Alarm Testing | 1/12/2007 | 1/12/2007 | 1/12/2007 4:02:58 PM | P | FAIL |
|
|
Provide as-builts, map at the facp and differential tests for hvac units 4 and 6
|
FIR07-00021
| INSP-Final Inspection | 1/12/2007 | 1/12/2007 | 1/12/2007 2:23:22 PM | P | FAIL |
|
|
I could not verify hangers above the newly installed hardlid ceilings.
|
FIR06-00900
| INSP-Final Inspection | 1/12/2007 | 1/12/2007 | 1/12/2007 2:11:35 PM | P | PASS |
|
|
permit finaled
|
FIR06-00968
| INSP-Final Inspection | 1/12/2007 | 1/12/2007 | 1/12/2007 2:11:14 PM | P | PASS |
|
|
permit finaled
|
FIR06-00733
| INSP-Final Inspection | 1/12/2007 | 1/12/2007 | 1/12/2007 1:42:18 PM | P | PASS |
|
|
Permit finaled
|
FIR06-00603
| INSP-Final Inspection | 1/12/2007 | 1/12/2007 | 1/12/2007 1:39:38 PM | P | PASS |
|
|
Permit finaled
|
FIR06-00631
| INSP-Sprinkler Rough-in/Hydro | 1/11/2007 | 1/12/2007 | 1/12/2007 1:39:09 PM | A | PASS |
|
|
overhead hydro and roughin passed.
|
FIR05-00644
| INSP-Sprinkler Rough-in/Hydro | 1/11/2007 | 1/12/2007 | 1/12/2007 10:43:29 AM | A | PASS |
|
|
hydro test for the 1st, 2nd, 3rd and 4th floors has passed.
|
FIR06-00623
| INSP-Sprinkler Rough-in/Hydro | 1/11/2007 | 1/12/2007 | 1/12/2007 9:42:58 AM | A | PASS |
|
|
Overhead hydro test passed.
|