ESC08-00741
| Site Final | 1/12/2009 | 1/12/2009 | 1/12/2009 5:39:20 PM | P | CANC |
|
|
|
BLD08-01889
| BLD-Final | 1/12/2009 | 1/12/2009 | 1/12/2009 5:38:48 PM | P | CANC |
|
|
Please call at least a half hour prior to inspection Phone #: ###-####
|
ESC08-00821
| Tracking Control | 1/12/2009 | 1/12/2009 | 1/12/2009 4:25:41 PM | P | CANC |
|
|
Re-sched...
|
BLD08-02561
| BLD-Foundation | 1/9/2009 | 1/12/2009 | 1/12/2009 4:24:08 PM | P | PASS |
|
|
greg Phone #: ###-####
|
BLD08-02130
| BLD-Final | 1/12/2009 | 1/12/2009 | 1/12/2009 12:05:45 PM | A | NR |
|
|
WIP
|
BLD07-02085
| BLD-Framing/Rough-in | 1/8/2009 | 1/12/2009 | 1/12/2009 12:03:45 PM | A | PART |
|
|
shearwall and roof inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb Exterior nailing at "B" wing (walls and Roof) OK
|