FIR08-00709
| INSP-Alarm Testing | 1/12/2009 | 1/12/2009 | 1/12/2009 5:49:40 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 1/12/2009 at 6:20:59 AM. Contact: ###-####.
|
FIR08-00778
| INSP-Sprinkler Rough-in/Hydro | 1/12/2009 | 1/12/2009 | 1/12/2009 5:49:17 PM | P | PASS |
|
|
The rough-in for the pre-action system passed. the hydro test passed.
|
BLD08-02270
| FIRE-Final Inspection | 1/12/2009 | 1/12/2009 | 1/12/2009 5:48:24 PM | P | FAIL |
|
|
Life safety will be ready to sign off when the project related fire alarm permit is finaled
|
FIR08-00854
| INSP-Alarm Testing | 1/9/2009 | 1/12/2009 | 1/12/2009 5:47:23 PM | P | FAIL |
|
|
The fire alarm system functioned correctly but the outside alarm bell did not activate upon water flow.
|
BLD08-00526
| FIRE-Final Inspection | 1/9/2009 | 1/12/2009 | 1/12/2009 1:09:02 PM | P | PASS |
|
|
Life safety passed. No storage is over 12' at this time.
|
FIR08-00550
| INSP-Conference | 1/12/2009 | 1/12/2009 | 1/12/2009 9:49:20 AM | P | DONE |
|
|
I left a message for Mark Cleverly with Thornton Ovliver that we were assured on 12/8/08 the alarm system installation would proceed. I visited the job site and found the alarm system still not functional and the building occupied. I contacted Mike with Peak Alarm and he stated that they would have the PIV connected today and then they would be waiting on phone lines and the elevator. Per the elevator contractor they are atleast three week out. I told Mike that the fire alarm system needs to be up and running. He was going to contact his boss and verify when phone lines would be installed.
|