Inspections for the day of: Monday, January 12, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00709 INSP-Alarm Testing1/12/20091/12/20091/12/2009 5:49:40 PMACANC
Scheduled by a contractor via Hello! on 1/12/2009 at 6:20:59 AM. Contact: ###-####.
FIR08-00778 INSP-Sprinkler Rough-in/Hydro1/12/20091/12/20091/12/2009 5:49:17 PMPPASS
The rough-in for the pre-action system passed. the hydro test passed.
BLD08-02270 FIRE-Final Inspection1/12/20091/12/20091/12/2009 5:48:24 PMPFAIL
Life safety will be ready to sign off when the project related fire alarm permit is finaled
FIR08-00854 INSP-Alarm Testing1/9/20091/12/20091/12/2009 5:47:23 PMPFAIL
The fire alarm system functioned correctly but the outside alarm bell did not activate upon water flow.
BLD08-00526 FIRE-Final Inspection1/9/20091/12/20091/12/2009 1:09:02 PMPPASS
Life safety passed. No storage is over 12' at this time.
FIR08-00550 INSP-Conference1/12/20091/12/20091/12/2009 9:49:20 AMPDONE
I left a message for Mark Cleverly with Thornton Ovliver that we were assured on 12/8/08 the alarm system installation would proceed. I visited the job site and found the alarm system still not functional and the building occupied. I contacted Mike with Peak Alarm and he stated that they would have the PIV connected today and then they would be waiting on phone lines and the elevator. Per the elevator contractor they are atleast three week out. I told Mike that the fire alarm system needs to be up and running. He was going to contact his boss and verify when phone lines would be installed.