Inspections for the day of: Monday, January 12, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00491 Tracking Control1/9/20091/12/20091/12/2009 4:05:35 PMAPART
Minor tracking. Sweeper scheduled.
ESC08-00977 BMP Violation1/9/20091/12/20091/12/2009 3:23:43 PMAPASS
ESC08-00819 Tracking Control1/12/20091/12/20091/12/2009 3:09:52 PMPFAIL
Verbal notice to RP.
1. Clean up all tracking onto Boise Ave.
2. Maintain costruction entrance.
3. Eliminate tracking from parking on muddy sholder of the roan infront of project area by installing access control or a stabilized temporary construction parking.
Will re-inspect 1/13/09 PM
ESC08-00788 BMP Violation1/12/20091/12/20091/12/2009 2:53:18 PMACANC
wrong date
ESC08-00790 Complaint Inspection1/12/20091/12/20091/12/2009 2:25:41 PMPFAIL
Corrction Notice: (Instructed RP via phone call)
1. Clean up all sediment and debris off of all hardsurfaces.
2. Maintain construction entrance at the south end of project area.
3. Install a sediment barrier along the east side of project to protect storm drain swale.
4. Install access barriers along the east and north east side of project area.
5. Install a second construction access at the north east end of project if being used for access or refer to correction 4.
Failure to comply will result in a Stop Work Order.
ESC08-00789 Complaint Inspection1/12/20091/12/20091/12/2009 2:25:20 PMPFAIL
Corrction Notice: (Instructed RP via phone call)
1. Clean up all sediment and debris off of all hardsurfaces.
2. Maintain construction entrance at the south end of project area.
3. Install a sediment barrier along the east side of project to protect storm drain swale.
4. Install access barriers along the east and north east side of project area.
5. Install a second construction access at the north east end of project if being used for access or refer to correction 4.
Failure to comply will result in a Stop Work Order.
ESC08-00788 Complaint Inspection1/12/20091/12/20091/12/2009 2:24:50 PMPFAIL
Corrction Notice: (Instructed RP via phone call)
1. Clean up all sediment and debris off of all hardsurfaces.
2. Maintain construction entrance at the south end of project area.
3. Install a sediment barrier along the east side of project to protect storm drain swale.
4. Install access barriers along the east and north east side of project area.
5. Install a second construction access at the north east end of project if being used for access or refer to correction 4.
Failure to comply will result in a Stop Work Order.
ESC06-00931 Aging Inspection1/12/20091/12/20091/12/2009 1:12:46 PM DONE
ESC06-00931 Site Final1/12/20091/12/20091/12/2009 1:12:31 PMPPASS
ESC08-00924 General Inspection1/12/20091/12/20091/12/2009 10:26:04 AMPPASS
Discharge is clean into seddling basin.
ESC08-00784 Tracking Control1/9/20091/12/20091/12/2009 9:51:32 AMAPASS
ESC08-00737 Tracking Control1/9/20091/12/20091/12/2009 9:48:57 AMAFAIL
Did address the issues prior but told RP to do a better job byv scraping and sweeping up sidewalks and gutterpans. Also told the RP to install a sediment barrier at the lot to the west due to the disturbance of the vegitative buffer and the slope. Will re-inspect on 1/14/09
ESC07-01595 Random Inspection1/12/20091/12/20091/12/2009 9:09:03 AMAFAIL
Verbal Notice to RP:
1. Clean all sediment and debris surrounding the trash bin.
2. Maintain costruction entrance. Clean all sediment out of the newly poured gutterpan.
3. Maintain all D.I. pertaining with the project area.
Will re-inspect 1/15/09
ESC08-00725 General Inspection1/12/20091/12/20091/12/2009 8:42:22 AMAFAIL
Verbal Notice: (left a message with the RP)
1. Install a sediment barrier along Irving St. due the the slope of disturbed area and have disturbed the vegitative buffer. Also recommended a covering of plastic over stockpile prior to any storm events that may occur if the piles are still present.
Will re-inspect on 1/15/09
ESC08-00490 General Inspection1/12/20091/12/20091/12/2009 8:22:39 AMAFAIL
Verbal Notice:
1. Clean all hard surface of all sediment and debris.
2. Maintain all storm drain inlets that are impaired by the project area.
3. Clean all gutter pans on the perimeter of the project area. Will re-inspect on 1/14/08 AM.