BLD09-02003
| BLD-Conference | 1/12/2010 | 1/12/2010 | 1/15/2010 5:54:45 PM | P | DONE |
|
|
Regarding hardware at the inactive leaf on one pair of double doors.
|
FIR09-00736
| INSP-Final Inspection | 1/12/2010 | 1/12/2010 | 1/14/2010 7:27:17 AM | P | FAIL |
|
|
Missing escutcheons, one concealed head is cut too high above the sheetrock lid.
|
FIR09-00654
| INSP-Final Inspection | 1/12/2010 | 1/12/2010 | 1/14/2010 7:24:08 AM | P | PASS |
|
|
Fire sprinkler work passed final inspection.
|
BLD09-01944
| FIRE-Final Inspection | 1/12/2010 | 1/12/2010 | 1/13/2010 2:59:52 PM | P | FAIL |
|
|
Missing exit signs per red-lines at four locations, post suite address, post two fire extinguishers at locations per discussion, project related fire sprinkler permit needs finaled.
|
FIR09-00597
| FIR-Aging Inspection | 1/12/2010 | 1/12/2010 | 1/13/2010 2:56:34 PM | | DONE |
|
|
Pending site inspection request for permit final.
|
FIR09-00596
| FIR-Aging Inspection | 1/12/2010 | 1/12/2010 | 1/13/2010 2:56:18 PM | | DONE |
|
|
Pending site inspection request for permit final.
|
FIR09-00669
| INSP-Sprinkler Rough-in | 1/12/2010 | 1/12/2010 | 1/13/2010 2:55:12 PM | P | PART |
|
|
Overhead fire sprinkler modifications approved for cover at the remodel areas on the 2nd and 4th floors only.
|
FIR09-00540
| INSP-Conference | 1/11/2010 | 1/12/2010 | 1/12/2010 2:09:55 PM | A | DONE |
|
|
Jonathan Phone #: ###-#### Re: antifreeze system testing
|
FIR08-00849
| INSP-Final Inspection | 1/11/2010 | 1/12/2010 | 1/12/2010 2:09:13 PM | A | PASS |
|
|
Scope of permit work passed site inspection.
|
FIR09-00698
| INSP-Final Inspection | 1/11/2010 | 1/12/2010 | 1/12/2010 2:05:57 PM | A | PASS |
|
|
Fire alarm work passed field testing, cd settings at two appliances adjusted while on site, permit finaled.
|
FIR09-00698
| INSP-Sprinkler Rough-in/Hydro | 1/11/2010 | 1/12/2010 | 1/12/2010 2:03:50 PM | A | PART |
|
|
Inspection request intended for a fire alarm final.
|