Inspections for the day of: Tuesday, January 12, 2010.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00575 INSP-Sprinkler Rough-in1/12/20101/12/20101/12/2010 4:05:59 PMPPASS
The remaining sprinkler piping for the first and second floor elevator lobbys are ok to cover.
BLD09-00945 FIRE-Conference1/11/20101/12/20101/12/2010 3:46:07 PMADONE
I went over life safety requirements for the remodel in the existing main lobby area. I found that fire alarm modifications that were not previously shown on the project related fire alarm permit will need to be submitted to show the changes that are required due to the use change in this lobby area.
FIR09-00484 INSP-Sprinkler Rough-in/Hydro1/11/20101/12/20101/12/2010 3:34:52 PMAPASS
The overhead hydro test passed.
BLD06-00535 FIRE-Final Inspection1/12/20101/12/20101/12/2010 11:56:35 AMAPASS
Life safety passed.
BLD09-02298 FIRE-Final Inspection1/11/20101/12/20101/11/2010 3:27:47 PMAPASS
Life safety passed. Single action hardware to be provided on the restroom door prior to the building inspection.