Inspections for the day of: Tuesday, January 12, 2010.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00046 Complaint Inspection1/12/20101/12/20101/13/2010 8:26:14 AMAPASS
All tracking has been cleaned up and the RP notified all of their sub-contractors that it is not allowed and if it occurs to clean up immeadiately.
ESC10-00003 Site Preparation1/12/20101/12/20101/12/2010 11:24:23 AM NR
Waiting on road improvement work first.
ESC09-00798 Site Preparation1/12/20101/12/20101/12/2010 9:56:18 AM FAIL
Verbal to RP:
Clean up all sediment from tracking from the front loader. Also place sediment barrier back into place prior to the storm event today and or by the end of the day. Will re-inspect on 1/13/10.
ESC09-00352 General Inspection1/12/20101/12/20101/12/2010 9:24:16 AMAPART
Still taking out the old intake structure. At the intake of the area they have utilized filtrex sock and sandbags to miniumize the flow of water enterinf the area. Also dewatering using a 4 pump that has been set 4ft down to lower the water level within the stucture area. The dischage point is to the north west of the area into the vegitative area where Wallings Creek begins. Water is clean but picking up sediment due to the fact that there is no energy disapater at the point of discharge. Told the RP to correct this issue by installing a energy disapater. Water is perking very well the the type B soil. (Pit run). Will re-inspect on 1/19/10am