BLD11-02455
| FIRE-Conference | 1/12/2012 | 1/12/2012 | 1/12/2012 5:22:51 PM | P | DONE |
|
|
Regarding fire code review note items.
|
BLD11-02361
| FIRE-Sprinkler Rough-in | 1/12/2012 | 1/12/2012 | 1/12/2012 5:22:12 PM | P | PART |
|
|
Fire sprinkler work okay to cover at the storage room, coat room, and vestibule ceilings.
|
FIR11-00365
| INSP-Sprinkler Rough-in | 1/11/2012 | 1/12/2012 | 1/12/2012 5:20:48 PM | A | FAIL |
|
|
Noted overspaced heads at coverage below ductwork, added room without sprinkler protection, incompleted install at the stair tower and elevator pit, deleted heads in a calc. area, obstructions at various heads due to proximity to facility equipment, pendent heads are installed in place of uprights at several locations. NOTE:* Construction, installation of mechanical equipment, process piping etc. has been allowed to proceed to such a point where numerous areas of this new system piping and sprinklers are now inaccessible or concealed from view. See requirements per IFC 2009 106.3 regarding " work to remain accessible and exposed for inspection purposes".
|
FIR11-00301
| INSP-Sprinkler Rough-in | 1/11/2012 | 1/12/2012 | 1/12/2012 4:26:33 PM | A | PART |
|
|
UG fire supply line flush at the NW riser feed completed satisfactory.
|
BLD11-01901
| FIRE-Final Inspection | 1/12/2012 | 1/12/2012 | 1/12/2012 1:28:10 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR11-00676
| INSP-Final Inspection | 1/11/2012 | 1/12/2012 | 1/12/2012 1:27:16 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
BLD11-02367
| FIRE-Final Inspection | 1/11/2012 | 1/12/2012 | 1/12/2012 1:20:31 PM | A | PART |
|
|
Temp. occupancy approved with conditions per J. Blais and R. Gervais.
|