Inspections for the day of: Monday, January 12, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorChad Schwendiman
TitleMEC-INSPECTOR
Phone #780-9549
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC14-05531 Final1/8/20151/12/20151/12/2015 4:38:29 PMPPASS
Please call Paula when on the way. She needs after 3:30pm, Phone #: ###-#### Inspection requested via web by PAM SCHANK
MEC15-00131 Final1/9/20151/12/20151/12/2015 3:50:52 PMPPASS
Installer Sam ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich
MEC14-04008 Final1/12/20151/12/20151/12/2015 2:43:57 PMPCANC
Please call Lars an hour before arrival because he needs to meet you to gain access. Phone #: ###-#### Inspection requested via web by Lars Fernandez
MEC14-05665 Final1/9/20151/12/20151/12/2015 1:57:44 PMPPASS
This is a Flue Pressure and Final Inspect. Pls meet our installer
at home at 1:30 PM. Install Mgr, Allen, Ph is ###-####.
Phone #: ###-#### Inspection requested via web by Mary LaFayette
MEC14-05201 Final1/12/20151/12/20151/12/2015 1:38:20 PMPPASS
if questions call Jim Little @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
MEC14-05305 Final1/9/20151/12/20151/12/2015 11:47:58 AMAFAIL
Phone #: ###-#### Inspection requested via web by Randy Hart - range hood not installed
MEC14-04989 Final1/10/20151/12/20151/12/2015 11:13:38 AMAFAIL
Phone #: ###-#### Inspection requested via web by Aaron Toomey - no air balance report on site
MEC14-05053 Conference1/12/20151/12/20151/12/2015 11:03:42 AMPDONE
The exhuast has been flexed on all of the 2nd floor and all except for the west wing of the 3rd floor from unit 317 on. These will need to have 10' of metal pipe from the pvc to the flex. all other units need to be hard piped the whole way out.
MEC14-05052 Conference1/12/20151/12/20151/12/2015 11:00:25 AMPDONE
Please call Bryan and he will meet you. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda - The exhaust has been flexed on all of the 2nd floor, and the north and middle wing of the 3rd floor. these runs will need 10' of metal duct from the pvc to the flex. all other units will need to be hard piped the whole way out.
MEC14-05666 Pressure Test1/9/20151/12/20151/12/2015 10:37:30 AMAPASS
sales Dennis ###-####
Installer Miguel ###-#### (did on Friday) Phone #: ###-#### Inspection requested via web by Dustin Rich - 20lb gas pass
MEC14-05666 DOC - Permit Finaled1/12/20151/12/20151/12/2015 10:36:28 AMPPASS
20lb gas pass
MEC14-04234 Final1/12/20151/12/20151/12/2015 10:02:33 AMPPASS
Rich Phone #: ###-####
MEC14-02814 Final1/9/20151/12/20151/12/2015 9:43:00 AMAPASS
Please call homeowner before showing up. Phone #: ###-#### Inspection requested via web by James Staley
MEC15-00097 Final1/9/20151/12/20151/12/2015 8:58:16 AMAPASS
Furnace room/laundry room upstairs is always open. Phone #: ###-#### Inspection requested via web by jeff jedlick
MEC15-00082 Pressure Test1/9/20151/12/20151/12/2015 8:23:32 AMAFAIL
Oleg Phone #: ###-#### - still missing acca report.
MEC13-03344 Mec-Aging Inspection1/12/20151/12/20151/12/2015 6:40:01 AM CANC
No calls