Inspections for the day of: Tuesday, January 12, 2016.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKatie Marron
TitleFIRE INSPECTOR
Phone #395-7809
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
NAF15-00017 INSP-Sprinkler Rough-in/Hydro1/11/20161/12/20161/12/2016 4:16:34 PMPPART
Rough in fully complete. All perviously noted items completed satifactory.

Hydro Failed. Pressure dropped by 1-2 psi. Walked and found drip by upright sprinkler head in production bay. Hydro to be redone tomorrow in conjunction with final.
GCB15-00028 FIRE-Final Inspection1/12/20161/12/20161/12/2016 2:27:09 PMPPASS
Life safety completed satisfactory.
NAF15-00044 INSP-Sprinkler Rough-in/Hydro1/12/20161/12/20161/12/2016 2:04:50 PMPPART
Undergound cover for run of pipe from riser with thrust block, to just before it turns parallel to street completed satisfactory.

90 degree bend & thrust block, pipe under driveway, and tap to main still be completed.