MEC17-00057
| Rough-in | 1/11/2017 | 1/12/2017 | 1/12/2017 3:05:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
MEC17-00057
| Pressure Test | 1/11/2017 | 1/12/2017 | 1/12/2017 3:05:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka 20lb gas
|
MEC17-00153
| Final | 1/11/2017 | 1/12/2017 | 1/12/2017 2:25:11 PM | P | PASS |
|
|
This is for Late PM if possible. Please call Cody B4 arrival to arrange time and access. thank you Phone #: ###-#### Inspection requested via web by Dustin Rich
|
MEC17-00155
| Final | 1/12/2017 | 1/12/2017 | 1/12/2017 1:36:10 PM | P | PASS |
|
|
Pressure test and final on furnace only install. Should be ready for pressure test early afternoon. Glen will be the technician on site ###-####. Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
MEC17-00111
| Pressure Test | 1/11/2017 | 1/12/2017 | 1/12/2017 10:43:34 AM | A | PART |
|
|
Would like late AM and a call when on way. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria 5lb flue
|
MEC17-00111
| Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 10:43:09 AM | P | PART |
|
|
Would like late AM and a call when on way. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria bath fans, range and makeup air duct, rerouting duct downstairs
|
MEC17-00111
| Final | 1/11/2017 | 1/12/2017 | 1/12/2017 10:41:53 AM | A | NR |
|
|
Would like late AM and a call when on way. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria
|
MEC16-05792
| Final | 1/11/2017 | 1/12/2017 | 1/12/2017 9:48:42 AM | A | PASS |
|
|
Please call Dave with a 30 minute heads up arrival time. ###-#### Phone #: ###-#### Inspection requested via web by David or K Cole
|
MEC17-00061
| Final | 1/5/2017 | 1/12/2017 | 1/12/2017 9:25:11 AM | A | PASS |
|
|
Please contact the Tenant, Jennifer at ###-#### with a 30 minute heads up arrival time. Phone #: ###-#### Inspection requested via web by David or K Cole
|