FIR16-00328
| INSP-Final Inspection | 1/12/2017 | 1/12/2017 | 1/12/2017 6:50:52 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00497
| INSP-Final Inspection | 1/12/2017 | 1/12/2017 | 1/12/2017 6:50:37 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00401
| INSP-Final Inspection | 1/12/2017 | 1/12/2017 | 1/12/2017 6:50:01 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00279
| INSP-Final Inspection | 1/12/2017 | 1/12/2017 | 1/12/2017 6:49:37 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00260
| INSP-Final Inspection | 1/12/2017 | 1/12/2017 | 1/12/2017 6:49:09 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00819
| INSP-Sprinkler Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 2:49:08 PM | P | CANC |
|
|
Inspection request per conversation with point of contact, Chris Phone #: ###-####, inspection request will be rescheduled for a later date.
|
FIR16-00664
| INSP-Sprinkler Rough-in/Hydro | 1/11/2017 | 1/12/2017 | 1/12/2017 1:35:20 PM | P | PART |
|
|
Hydrostatic test for overhead fire sprinkler piping complete. Rough in inspection complete for overhead fire sprinkler piping, tenting insulation still needs to be installed, piping cannot be covered until tenting is complete and passed inspection.
|
FIR16-00223
| INSP-Sprinkler Rough-in | 1/11/2017 | 1/12/2017 | 1/12/2017 9:42:29 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler located under the level 1 mezzanine, east side complete, approved for cover.
|
BLD16-00679
| FIRE-Final Inspection | 1/11/2017 | 1/12/2017 | 1/12/2017 9:11:03 AM | A | CANC |
|
|
Inspection request for life safety cancelled, FIR permit for alarms in issued status and not ready for inspection.
|
FIR16-00504
| INSP-Final Inspection | 1/11/2017 | 1/12/2017 | 1/12/2017 9:09:51 AM | A | PASS |
|
|
Final fire sprinkler inspection passed/completre
|
FIR16-00510
| INSP-Sprinkler Rough-in/Hydro | 1/11/2017 | 1/12/2017 | 1/12/2017 8:26:03 AM | A | CANC |
|
|
Level 2 hydro completed on 11JAN2017
|