BLD17-02078
| BLD-Wall Bracing | 1/12/2018 | 1/12/2018 | 1/12/2018 6:15:48 PM | P | PASS |
|
|
Wade Phone #: ###-####
|
BLD17-00583
| BLD-Other | 1/12/2018 | 1/12/2018 | 1/12/2018 6:15:11 PM | P | DONE |
|
|
1st floor exterior walls and consult on elevator equipment room Phone #: ###-#### Inspection requested via web by David Banks
|
BLD17-02965
| BLD-Framing/Rough-in | 1/12/2018 | 1/12/2018 | 1/12/2018 6:14:45 PM | P | PART |
|
|
Bob Phone #: ###-#### garage only ok to insulate
|
BLD17-00384
| BLD-Final | 1/12/2018 | 1/12/2018 | 1/12/2018 6:14:08 PM | P | PASS |
|
|
|
BLD17-00384
| DOC - Permit Finaled | 1/12/2018 | 1/12/2018 | 1/12/2018 6:13:57 PM | P | PASS |
|
|
|
BLD17-03955
| BLD-Foundation | 1/11/2018 | 1/12/2018 | 1/12/2018 11:27:11 AM | A | PASS |
|
|
wall // Greg Phone #: ###-####
|
BLD17-03709
| BLD-Framing/Rough-in | 1/12/2018 | 1/12/2018 | 1/12/2018 8:44:11 AM | A | PASS |
|
|
We got a UL rated drawing from the Architect on those columns. Please call Jake at ###-#### and he can meet you with a printed copy. Everything is wrapped with 2 layers and the ones on the west wall has three layers on the face. Phone #: ###-#### Inspection requested via web by Mike Beeson
|