BLD99-02051
| BLD-Framing/Rough-in | 1/13/2000 | 1/13/2000 | 1/13/2000 12:00:00 AM | A | PART |
|
|
Conference on 2hr occ. sep. wall. Wall to be constructed as per architects detail or Paul Seedy document detail. Ceiling and bearing wall to be maintained as 1hr construction. 2nd layer of rock on 2hr wall ok.
|