MEC02-03095
| Final | 1/10/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 15:25:34. Contact: .
|
MEC03-00003
| Rough-in | 1/10/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 16:42:39. Contact: ###-####.
|
BLD02-02954
| BLD-Conference | 1/13/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | A | CANC |
|
|
###-####, Wendy. Siding
|
BLD02-02361
| BLD-Final | 1/10/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 13:44:44. Contact: ###-####.
|
BLD02-03045
| BLD-Framing/Rough-in | 1/10/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | A | PASS |
|
|
###-#### or ###-#### owner changed plans add a second story they resubmitted plans were told to check with me this is a storage shed on the back of a unattaced garage all framing is per code ok to proceed 1/13/2003 9:41:57 AM
|
BLD02-02954
| BLD-Final | 1/13/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | A | PASS |
|
|
|
BLD02-02531
| BLD-Framing/Rough-in | 1/10/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | P | FAIL |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need a set of city aproved plans on site 1/13/2003 2:21:09 PM
|
MEC02-03459
| Final | 1/10/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | P | FAIL |
|
|
DULPEX UNIT 1-PERMIT ; Phone #: ###-#### Internet Inspection Request from: Michelle Evans furnaces ok but water heater in1926 is not 18" above floor I M G did pressure test 1/13/2003 1:24:41 PM
|
MIS03-00008
| BLD-Conference | 1/13/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | P | DONE |
|
|
Per Marlene House may be in process of Demo, maybe down already...There are no Bldg permits for a demo or for a new home...no sewer cap permit on file with pw... Would you please check into it for us and get back to me when you can...Thank you Annette stopped by no one home no living in home no sign of any demo work being done at this time 1/13/2003 3:35:16 PM
|
BLD03-00006
| BLD-Footing | 1/13/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | P | PASS |
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie owner pouring ftg and wall at same time 1/13/2003 12:58:30 PM
|
MEC03-00035
| Rough-in | 1/13/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/13/2003 at 09:59:16. Contact: .c/n on site 1/13/2003 3:30:46 PM
|
MEC03-00104
| Rough-in | 1/13/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | P | PASS |
|
|
randy ###-####
|
MEC03-00104
| Pressure Test | 1/13/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | P | PASS |
|
|
randy ###-####
|
BLD02-01430
| BLD-Final | 1/13/2003 | 1/13/2003 | 1/13/2003 12:00:00 AM | P | PASS |
|
|
for swimming pool -charity; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|