MEC04-00057
| Final | 1/12/2004 | 1/13/2004 | 1/13/2004 12:00:00 AM | A | PASS |
|
|
PLEASE INSPECT GAS TO GAS FURNACE IN CRAWL FOR AS CLOSE TO 10:30 AS POSSIBLE. THANKS, CAROL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
MEC04-00075
| Rough-in | 1/12/2004 | 1/13/2004 | 1/13/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 4:32:49 PM. Contact: ###-####.
|
MEC04-00075
| Pressure Test | 1/12/2004 | 1/13/2004 | 1/13/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 4:33:07 PM. Contact: ###-####.
|
BLD03-03008
| BLD-Foundation | 1/13/2004 | 1/13/2004 | 1/13/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 1/13/2004 at 7:01:30 AM. Contact: ###-####. WIP--80% ready--rebar in place. 1/13/2004 8:52:36 AM
|
ESC03-01628
| Tracking Control | 1/13/2004 | 1/13/2004 | 1/13/2004 12:00:00 AM | P | FAIL |
|
|
Track out on roadways--informed rp and concrete contractor to cleanup by end of the day. Clean daily or as needed. Will follow up. 1/13/2004 2:08:15 PM
|
ESC03-01555
| Site Preparation | 1/13/2004 | 1/13/2004 | 1/13/2004 12:00:00 AM | P | CANC |
|
|
|
ESC03-00715
| Site Preparation | 1/13/2004 | 1/13/2004 | 1/13/2004 12:00:00 AM | P | PART |
|
|
Informed rp to clean up any track out and that d.i. protection is needed on the corner of Straughan and State. Will follow up. 1/13/2004 3:07:51 PM
|
ESC03-01126
| Site Preparation | 1/13/2004 | 1/13/2004 | 1/13/2004 12:00:00 AM | P | PASS |
|
|
BMP's appear adequate for this phase of construction. Straw wattles are inplace surrounding stockpile soils. Adequate vegetation as well as straw wattle on downhill side of project. Sweep daily or as needed. 1/13/2004 2:46:56 PM
|