BLD04-02434
| BLD-Final | 1/12/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | A | PASS |
|
|
C/C issued. 1/13/2005 12:35:07 PM
|
BLD04-02922
| BLD-Foundation | 1/12/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | A | PASS |
|
|
manuel; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD04-01267
| BLD-Energy code compliance | 1/12/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 5:21:50 PM. S. 1/2 of 2nd and 3rd floor OK. 1/13/2005 11:44:47 AM
|
BLD04-01166
| BLD-Conference | 1/13/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | A | DONE |
|
|
Owner still working on this project. Jim Sly 316
|
MEC05-00131
| Final | 1/12/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | P | PASS |
|
|
Please inspect as late as possible. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC05-00047
| Rough-in | 1/12/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 3:01:17 PM. Contact: ###-####.
|
BLD04-01267
| BLD-Wall cover | 1/12/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 5:22:26 PM.
|
MEC05-00064
| Rough-in | 1/13/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | P | PASS |
|
|
P/T OK 1/13/2005 1:35:32 PM
|
MEC05-00073
| Rough-in | 1/13/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | P | PASS |
|
|
P/T previously passed by ? 1/13/2005 1:36:03 PM
|
MEC05-00140
| Rough-in | 1/13/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | P | NR |
|
|
keith-- ###-####
|
MEC05-00140
| Pressure Test | 1/13/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | P | NR |
|
|
keith- ###-####
|
BLD04-02966
| BLD-Footing | 1/13/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/13/2005 at 10:14:23 AM. Contact: ###-####. Mono pour foot and wall ok 1/13/2005 2:43:11 PM
|