FIR04-00603
| FIR-Aging Inspection | 1/13/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | | PASS |
|
|
Talked to Alicia and this is completed and the final inspection will be scheduled for 1/17 or 1/18 1/13/2005 12:04:00 PM
|
FIR04-00130
| INSP-Sprinkler Rough-in/Hydro | 1/12/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 12:46:54 PM. Okay to cover breakdown aeas and locker rooms; breakdown modified from plans but spacing/coverage maintained; will close this out at building final 1/13/2005 10:04:04 AM
|
FIR04-00272
| INSP-Sprinkler Rough-in/Hydro | 1/12/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | A | PASS |
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice R/i and hydro on OH okay; the dry sidewall and top of stair was rerouted from the mechanical room - the branch line was increased to 1.5 inch; awaiting alarm testing 1/13/2005 11:14:10 AM
|
FIR04-00770
| INSP-Final Inspection | 1/12/2005 | 1/13/2005 | 1/13/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 2:33:36 PM. Contact: ###-####. Final okay; after hours inspection from 6:30 - 8:30 pm 1/14/2005 7:58:55 AM
|