FIR07-00801
| INSP-Final Inspection | 1/13/2009 | 1/13/2009 | 1/14/2009 5:37:44 PM | P | PASS |
|
|
Okay for final, inspection completed in conjunction with project related fire alarm permit for the 2nd floor tenant improvement work.
|
FIR08-00270
| INSP-Sprinkler Rough-in/Hydro | 1/13/2009 | 1/13/2009 | 1/13/2009 5:21:57 PM | A | PART |
|
|
Rough-in inspection completed satisfactory, discussed acceptance testing, hydrostatic and pneumatic testing schedule, and remainder of items needed prior to final including signage, locks at control valves, review notes, etc.
|
FIR08-00850
| INSP-Conference | 1/13/2009 | 1/13/2009 | 1/13/2009 5:17:13 PM | P | DONE |
|
|
Regarding site inspection schedule.
|
FIR07-01005
| INSP-Conference | 1/13/2009 | 1/13/2009 | 1/13/2009 5:16:29 PM | P | DONE |
|
|
Regarding after hours site inspection request.
|
BLD08-02450
| FIRE-Final Inspection | 1/13/2009 | 1/13/2009 | 1/13/2009 5:15:35 PM | P | NR |
|
|
Not ready for final per J. Storey.
|
BLD08-01294
| FIRE-Final Inspection | 1/12/2009 | 1/13/2009 | 1/13/2009 1:31:48 PM | A | PASS |
|
|
Fire life safety inspection passed, correction items verified for completion.
|