BLD10-01205
| FIRE-Final Inspection | 1/6/2011 | 1/7/2011 | | A | |
|
|
301
|
BLD10-02388
| FIRE-Final Inspection | 1/13/2011 | 1/13/2011 | 1/19/2011 9:54:31 AM | P | PASS |
|
|
Fire life safety finaled.
|
FIR10-00538
| FIR-Aging Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 3:14:30 PM | | PEND |
|
|
Ref. activity notes 11/9/10
|
FIR10-00506
| FIR-Aging Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 3:12:03 PM | | PASS |
|
|
Permit finaled 1/13/11.
|
FIR10-00425
| INSP-Sprinkler Rough-in/Hydro | 1/12/2011 | 1/13/2011 | 1/13/2011 3:10:24 PM | P | PART |
|
|
Underground fire supply line hydrostatic test completed acceptable.
|
FIR10-00655
| INSP-Sprinkler Rough-in | 1/13/2011 | 1/13/2011 | 1/13/2011 2:59:30 PM | P | FAIL |
|
|
Replacement coverage overspaced.
|
FIR10-00425
| INSP-Final Inspection | 1/12/2011 | 1/13/2011 | 1/13/2011 2:57:01 PM | P | NR |
|
|
Missing field ceiling tile, escutcheons, DCVA certification, forward flow, etc.
|
FIR10-00631
| INSP-Alarm Testing | 1/12/2011 | 1/13/2011 | 1/13/2011 2:55:20 PM | P | NR |
|
|
bryan Phone #: ###-####
|
BLD10-02129
| FIRE-Final Inspection | 1/12/2011 | 1/13/2011 | 1/13/2011 2:55:02 PM | A | PASS |
|
|
Fire life safety passed. Note: manual flush bolts at door pairs two locations to be removed or disabled per agreement.
|
FIR10-00506
| INSP-Final Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 2:50:40 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR10-00571
| INSP-Final Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 2:50:14 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR10-00439
| INSP-Final Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 2:49:45 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
BLD10-02129
| FIRE-Conference | 1/11/2011 | 1/13/2011 | 1/12/2011 4:12:21 PM | A | CANC |
|
|
Meet in building 25 Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|