FIR10-00643
| INSP-Final Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 4:08:31 PM | P | PASS |
|
|
permit finaled
|
BLD11-00056
| FIRE-Conference | 1/13/2011 | 1/13/2011 | 1/13/2011 4:07:25 PM | P | FAIL |
|
|
Repair all exit signs/emergency lights. Provide additional exit signs, as per plans, for secondary egress from second floor. Remove dead bolt from second floor exit door. If door to warehouse fom second floor is installed, provide lever hardware. Provide single action hardware on double doors from warehouse. Provide annual inspection for all fire extinguishers. Provide annual inspection for fire sprinkler system. Repare fire alarm system.
|
FIR10-00028
| INSP-Final Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 3:58:04 PM | P | CANC |
|
|
Canceled due to time constraints and Micron plan review
|
FIR10-00144
| INSP-Final Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 3:57:14 PM | P | CANC |
|
|
Canceled due to time constraints and Micron plan review
|
BLD10-02683
| FIRE-Final Inspection | 1/12/2011 | 1/13/2011 | 1/13/2011 3:09:09 PM | A | FAIL |
|
|
Provide sticker and indicator at the exterior double door as discussed.
|
FIR10-00579
| INSP-Sprinkler Rough-in | 1/12/2011 | 1/13/2011 | 1/13/2011 12:16:30 PM | A | PASS |
|
|
The piping in the main/front canopy can be covered. See the city approved plans for location with todays date.
|
FIR10-00658
| INSP-Final Inspection | 1/11/2011 | 1/13/2011 | 1/13/2011 10:43:44 AM | A | FAIL |
|
|
Provide building map as per note 19, provide knox box per note 20, adjust the backflow tamper switch and retest, provide the correct orfice in the inspectors test and test flow switch.
|
BLD10-02170
| FIRE-Final Inspection | 1/12/2011 | 1/13/2011 | 1/13/2011 10:34:06 AM | A | PASS |
|
|
Life safety passed
|
FIR10-00548
| INSP-Final Inspection | 1/12/2011 | 1/13/2011 | 1/13/2011 10:32:23 AM | A | PASS |
|
|
permit finaled
|