Inspections for the day of: Friday, January 13, 2012.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-03014 FIRE-Conference1/13/20121/13/20121/13/2012 3:34:04 PMPDONE
I went over life safety requirements for both suite 170 and 180 with the owner.
BLD12-00009 FIRE-Final Inspection1/13/20121/13/20121/13/2012 2:58:25 PMPPART
A temporary occupancy was given until the maximum load and maximum storage height placards have been installed.
BLD11-00946 FIRE-Final Inspection1/13/20121/13/20121/13/2012 2:57:40 PMPPART
A temporary occupancy was given until the new wrought iron gate with the opticon system has been installed and tested.
FIR12-00002 INSP-Final Inspection1/13/20121/13/20121/13/2012 2:56:34 PMPPASS
Permit finaled
FIR11-00563 INSP-Sprinkler Rough-in1/12/20121/13/20121/13/2012 2:56:19 PMAPASS
See the city approved plans for the fourth floor west end rooms, marked in red, where the sprinkler piping rough-in passed. The corridor was not included. Piping can not be covered until the tenting has been installed and inspected. I notified the general contractor of this and he stated that the tenting should be complete by tuesday and an inspection request would be called in. I did note that one sprinkler pendant needs to be added due to overspacing from an exterior wall pocket.
FIR12-00010 INSP-Final Inspection1/12/20121/13/20121/13/2012 11:19:30 AMAPASS
permit finaled