Inspections for the day of: Friday, January 13, 2012.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00708 Aging Inspection1/13/20121/13/20121/18/2012 4:48:13 PM DONE
BLD11-02533 BLD-Wall cover1/13/20121/13/20121/13/2012 4:13:24 PMPNR
firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin
ESC11-00760 Random Inspection1/13/20121/13/20121/13/2012 4:13:13 PMPPASS
ESC11-00758 Random Inspection1/13/20121/13/20121/13/2012 4:13:00 PMPPASS
BLD11-02535 BLD-Wall cover1/13/20121/13/20121/13/2012 4:12:48 PMPCANC
Firewall construction Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD11-01742 BLD-Final1/13/20121/13/20121/13/2012 4:12:39 PMPCANC
Mark (job was done a long time ago, just never scheduled inspection) Phone #: ###-####
BLD11-01247 BLD-Final1/13/20121/13/20121/13/2012 4:12:31 PMPDONE
Mark (job was done a long time ago, just never scheduled inspection) Phone #: ###-####
BLD11-01247 DOC - Permit Finaled1/13/20121/13/20121/13/2012 4:12:23 PMPPASS
All work appeared to be done in accordance with local code and ordinances.
BLD11-01247 BLD-Final1/13/20121/13/20121/13/2012 4:11:39 PMPDONE
Mark (job was done a long time ago, just never scheduled inspection) Phone #: ###-####
BLD11-01742 BLD-Final1/13/20121/13/20121/13/2012 4:11:21 PMPDONE
Mark (job was done a long time ago, just never scheduled inspection) Phone #: ###-####
BLD11-01742 DOC - Permit Finaled1/13/20121/13/20121/13/2012 4:11:12 PMPPASS
All work appeared to be done in accordance with local code and ordinances.
ESC11-00425 BMP Violation1/13/20121/13/20121/13/2012 3:30:22 PMPPART
work in progress on cleanup.
BLD11-01444 BLD-Energy code compliance1/13/20121/13/20121/13/2012 3:29:03 PMPPASS
Should be ready at 3:00. Thanks Jim Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD11-00946 BLD-Final1/13/20121/13/20121/13/2012 3:08:55 PMPPART
Ray Kane Phone #: ###-####. ok for temp occ. Needs to provide code compliant guard and handrails at main stairway, note that their is an additional stairway and elevator for egress. Provide boots under sinks in restrooms 1st. floor, and provide code compliant passage hardware from accounting offices, dead has been removed. Also needs to have engineer of record approve non compliance issues noted on final special inspection letter.
ESC11-00265 Site Final1/13/20121/13/20121/13/2012 3:05:14 PMPDONE
ESC11-00265 DOC - Permit Finaled1/13/20121/13/20121/13/2012 3:05:00 PMPPASS
All BMP's have ben removed, final stabalization has been completed.
ESC11-00901 Random Inspection1/13/20121/13/20121/13/2012 3:04:29 PMPPASS
BLD11-02929 BLD-Foundation1/12/20121/13/20121/13/2012 3:04:13 PMPPASS
Ben Phone #: ###-####
BLD11-00179 BLD-Other1/12/20121/13/20121/13/2012 10:35:19 AMAPART
gary - rough shear nailing Phone #: ###-####. Roof shear nailing from gridline 20 west to edge of building between grids A to E. Nailing ok, work in progress on installing straps.
ESC11-00807 Random Inspection1/13/20121/13/20121/13/2012 10:02:04 AMAPASS
BLD11-02709 BLD-Framing/Rough-in1/12/20121/13/20121/13/2012 10:01:47 AMAPART
Provide straps on trimmer studs up to top plate at portal frame at garage, provide addtional nailing on 2 ply hip truss upstairs. ok to insulate.
ESC11-00707 Random Inspection1/13/20121/13/20121/13/2012 9:41:02 AMAPASS
BLD11-02377 BLD-Energy code compliance1/12/20121/13/20121/13/2012 9:40:49 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Tony Luchini