BLD12-01991
| FIRE-Final Inspection | 1/13/2014 | 1/13/2014 | 1/16/2014 5:24:50 PM | P | PASS |
|
|
|
FIR13-00422
| INSP-Final Inspection | 1/13/2014 | 1/13/2014 | 1/14/2014 7:54:26 AM | P | PART |
|
|
Previous corrections verified for completion. Final pending drop ceiling and finishes at the meeting room.
|
FIR13-00412
| INSP-Final Inspection | 1/10/2014 | 1/13/2014 | 1/13/2014 1:07:02 PM | A | PASS |
|
|
Fire sprinkler permit work approved for final.
|
FIR13-00667
| INSP-Final Inspection | 1/10/2014 | 1/13/2014 | 1/13/2014 1:04:37 PM | A | PASS |
|
|
Fire sprinkler work passed both rough-in and final inspection. Permit finaled.
|
BLD13-03066
| FIRE-Final Inspection | 1/10/2014 | 1/13/2014 | 1/13/2014 11:26:15 AM | A | PASS |
|
|
Fire life safety inspection passed.
|
BLD13-03295
| FIRE-Final Inspection | 1/10/2014 | 1/13/2014 | 1/13/2014 11:24:23 AM | A | FAIL |
|
|
C/N items include; repair one EM light, post signage at the salon main entry/exit, provide current certifications for the two fire extinguishers.
|
FIR13-00711
| INSP-Final Inspection | 1/10/2014 | 1/13/2014 | 1/13/2014 12:00:00 AM | A | CANC |
|
|
Curtis Phone #: ###-####
|