ESC15-00762
| Site Preparation | 1/13/2016 | 1/13/2016 | 1/14/2016 2:15:31 PM | P | CANC |
|
|
rescheduled
|
ESC15-00210
| General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 2:16:52 PM | | PART |
|
|
WIP.
Corrections: - pick up windblown trash in street - sweep up trackout from driveway and open lot across street that used for parking or turn around by subcontractors.
|
ESC15-01560
| Site Final | 1/6/2016 | 1/13/2016 | 1/13/2016 2:09:33 PM | A | NR |
|
|
Required to have street sweeper and schedule Site Final
Project appears complete, temp BMPs installed will need removal and the streets swept as requested. No activity at site. No new trackout or violations. Will check back. Permit sign is posted visibly.
|
ESC15-01091
| BMP Violation | 1/13/2016 | 1/13/2016 | 1/13/2016 11:46:52 AM | P | FAIL |
|
|
2nd warning to RP
Corrections: - need to re-post yellow ESC sign - remove dirty/degraded wattle from street, improper use of BMP - sweep street, gutter, and sidewalk - empty out DI bag, replace/install new bag - install sediment control BMP along sidewalk and provide trash containment.
VM left to Michael with Azure Properties. Will reinspect Friday.
|
ESC15-00360
| General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 11:22:05 AM | | PASS |
|
|
Home is complete with BLD finaled and hillside vegetation and stabilization bond issued.
Will conltinue to monitor hydroseeded area and drainage area below home toward Wind Dancer, an erosion rill is identifiable but no sediment leaving site.
|
ESC14-00135
| General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 11:16:17 AM | | PASS |
|
|
Home is complete and occupied. PW bond issued for hillside revegetation and stabilzation. Homeowner and JH Developement are aware of erosion and sediment control requirements. Area to the right of home has been seeded once, will get another application in the spring. Will inspect area under BH#6 permit ESC15-00094
|
ESC14-00135
| DOC - Permit Finaled | 1/13/2016 | 1/13/2016 | 1/13/2016 11:14:35 AM | P | PASS |
|
|
|
ESC15-01374
| Site Preparation | 1/12/2016 | 1/13/2016 | 1/13/2016 11:11:32 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
Approved to start, permit sign posted. Significant trackout in alleys and streets in all sections of Dallas Harris Estates 12-13.
Will check back at end of week for sweeping and check inlet filter bags for maintenance.
Street
|
ESC13-00755
| General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 10:40:39 AM | | PASS |
|
|
No activity at Terraces. Some equipment is still in the laydown and some final clean up needed.
Some temp BMPs have been removed, will do final walk-through next general inspection.
|
ESC15-00669
| Aging Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 9:45:48 AM | | PASS |
|
|
Project complete. BLD finaled. No disturbed area or source of sediment leaving site. Permit finaled.
|
ESC15-00669
| DOC - Permit Finaled | 1/13/2016 | 1/13/2016 | 1/13/2016 9:45:12 AM | P | PASS |
|
|
|
ESC15-00221
| General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 9:41:15 AM | | PASS |
|
|
|
ESC15-00354
| Aging Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 9:12:08 AM | | PASS |
|
|
WIP. No trackout or other violations observed.
|
ESC15-00353
| Aging Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 9:11:53 AM | | PASS |
|
|
WIP. No trackout or other violations observed.
|
ESC15-00391
| General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 8:51:31 AM | | PASS |
|
|
No subdivision activity, two SFHs in progress on culdesac. Stormdrain sediment filter bag is in good condtion, lined washout has over 50% capacity remaining for next foundation.
Trackout from house currently being framed has been requested to be swept.
No discharges or trackout leaving the culdesac. Need to be sure to keep access blocked from Skycrest St. to the north.
|