ELE13-00686
| ELE-Aging Inspection | 1/13/2017 | 1/13/2017 | 1/19/2017 7:43:26 AM | | DONE |
|
|
Message was left on 8/17/16. Still no inspection requested at this time. 1/19/17
|
ELE16-00442
| Electrical Rough-In | 1/13/2017 | 1/13/2017 | 1/13/2017 1:05:32 PM | P | PASS |
|
|
Jake Phone #: ###-#### 3rd floor corridor cans ok cover
|
ELE17-00058
| Rough-In Permanent Service | 1/13/2017 | 1/13/2017 | 1/13/2017 12:40:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Rohl p/s o/h rec ok
|
ELE16-02400
| Final | 1/12/2017 | 1/13/2017 | 1/13/2017 12:12:28 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Christy Cheney 1. GFI needed in public bathroom on outside of building. 2. Apartment above needs TR outlets as per Article 210.
|
ELE16-02399
| Final | 1/12/2017 | 1/13/2017 | 1/13/2017 12:10:30 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Christy Cheney Bldg A final ok
|
ELE16-03037
| Final | 1/12/2017 | 1/13/2017 | 1/13/2017 10:59:45 AM | A | PASS |
|
|
Please call ahead for entry info. Phone #: ###-#### Inspection requested via web by Rhonda Yoast ok final
|
ELE17-00059
| Final | 1/12/2017 | 1/13/2017 | 1/13/2017 10:07:31 AM | A | PASS |
|
|
Mitch Phone #: ###-#### ok final
|
ELE17-00069
| Final | 1/12/2017 | 1/13/2017 | 1/13/2017 9:29:15 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Samatha Solberg
|
ELE16-03616
| Electrical Rough-In | 1/13/2017 | 1/13/2017 | 1/13/2017 9:19:09 AM | P | CANC |
|
|
Floor heat bathroom insp Phone #: ###-#### >> Inspection requested via web by John VanZandt Inspection cancelled from web by: John VanZandt
|
ELE17-00076
| Permanent Service | 1/12/2017 | 1/13/2017 | 1/13/2017 9:02:17 AM | A | PASS |
|
|
KEY FOR ACCESS INTO UNIT IS IN SWITCH GEAR OUTSIDE RIGHT SIDE CHEST HIGH HANGING ON A BOLT INSIDE CAB GEAR Phone #: ###-#### Inspection requested via web by mike brown p/s n u/g ok
|
ELE17-00055
| Final | 1/13/2017 | 1/13/2017 | 1/13/2017 8:40:54 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shaun Kirkman Looked at service on 1/11/17, received pictures of labeled panel. Ok final
|
ELE17-00081
| Electrical Rough-In | 1/12/2017 | 1/13/2017 | 1/13/2017 8:39:15 AM | A | PASS |
|
|
call first, ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER ok cover
|