BLD16-03574
| FIRE-Final Inspection | 1/13/2017 | 1/13/2017 | 1/13/2017 2:24:29 PM | P | PASS |
|
|
Life safety passed
|
BLD16-02141
| FIRE-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 2:23:06 PM | P | FAIL |
|
|
Need the project related fire sprinkler permit finaled and the emergency light over the east exit door repaired.
|
FIR16-00704
| INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 2:21:23 PM | P | FAIL |
|
|
Not ready for a final yet still need the 2 hour hydro test and reconnection to the main system. The 24 hour air test passed
|
BLD16-01382
| FIRE-Final Inspection | 1/13/2017 | 1/13/2017 | 1/13/2017 1:58:09 PM | P | PASS |
|
|
Life safety passed.
|
FIR16-00646
| INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 1:57:46 PM | P | CANC |
|
|
Not ready for final due to the project related sprinkler permits. Need document box as discussed.
|
FIR16-00640
| INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 1:56:41 PM | P | FAIL |
|
|
Not ready for inspection. Missing signage on riser door, missing sticker on bell, room is not one hour rated due to holes in the walls, missing canopy on sprinkler beneath stairs, project related undergrond permit has not been scheduled and the underground supply piping has not been flush yet. Need correct outlet to verify single sprinkler flow for testing the flow switch. Need backflow certified.
|
BLD16-03819
| FIRE-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 8:52:27 AM | A | FAIL |
|
|
Provide emergency lighting in the conference room as per the approved plans.
|
FIR16-00766
| INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 8:51:51 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00310
| INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 8:51:22 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00337
| INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 8:50:53 AM | A | FAIL |
|
|
Need to change the programing of the pre-action release panel to delete the 30 countdown as discussed. All other items have been tested.
|