MEC97-00056
| INSP - Retro Fit (check note) | 1/13/1997 | 1/14/1997 | 1/16/1997 12:00:00 AM | P | NH |
|
|
###-#### no answer, will ck back
|
MEC97-00119
| INSP - Rough-in & Gas Pressure | 1/14/1997 | 1/14/1997 | 1/15/1997 12:00:00 AM | P | CANC |
|
|
CALLED IN AT 10:OO..WES SAID INSPECTIONS BLEW OUT OF TRUCK..WILL PICK UP FIRST THING WED AM....will do 1/16 am as plan has to be picked up at City and taken to sight
|
BLD1051174
| INSP - Conference | 1/15/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | | PART |
|
|
2nd phone call from owner to cell phone @ $.45/min
|
BLD1056363
| INSP - Conference | 1/14/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | | PASS |
|
|
still working on this project
|
BLD96-00252
| INSP - Conference | 1/14/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | A | PASS |
|
|
faving engineer's report
|
BLD96-00252
| INSP - Foundation | 1/13/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | A | PART |
|
|
engineer's stamped change to be faxed to Building Dept
|
BLD96-00252
| INSP - Masonry | 1/14/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | A | PASS |
|
|
2nd lift, special inspector on site, hairpins changed, Engineer to address. 1/4" clearance ok (as per engineer)
|
BLD96-02701
| INSP - Framing/Rough-in | 1/13/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | A | FAIL |
|
|
truss brace, stair rise varies 7" to 8", hgr missing, eng req'd for tji's utilized for lateral restraint of basement wall, place clips on posts as per plan, transfer pt lds, dbl joists as req'd
|
BLD96-02897
| INSP - Framing/Rough-in | 1/14/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | A | FAIL |
|
|
covered w/o inspection, cut trusses, need eng fix and access
|
BLD96-03020
| INSP - Energy code compliance | 1/13/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | A | PASS |
|
|
in process of doing skylight and will finish when they do blow in, removed undated green tag....no blue tag posted. posted green tag
|
BLD96-03311
| INSP - Footings | 1/13/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | A | CANC |
|
|
given to Carl
|
MEC97-00077
| INSP - Rough-in & Gas Pressure | 1/14/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | P | PASS |
|
|
|
BLD96-01913
| INSP - Final | 1/14/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | P | NR |
|
|
|
BLD96-02016
| INSP - Foundation | 1/14/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | P | NR |
|
|
rebar for walls
|
BLD96-02360
| INSP - Framing/Rough-in | 1/14/1997 | 1/14/1997 | 1/14/1997 12:00:00 AM | P | FAIL |
|
|
transfer pt lds, brace truss as per eng, blk tji's w/ld brng above
|