Inspections for the day of: Tuesday, January 14, 1997.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC97-00056 INSP - Retro Fit (check note)1/13/19971/14/19971/16/1997 12:00:00 AMPNH
###-#### no answer, will ck back
MEC97-00119 INSP - Rough-in & Gas Pressure1/14/19971/14/19971/15/1997 12:00:00 AMPCANC
CALLED IN AT 10:OO..WES SAID INSPECTIONS BLEW OUT OF TRUCK..WILL PICK UP FIRST THING WED AM....will do 1/16 am as plan has to be picked up at City and taken to sight
BLD1051174 INSP - Conference1/15/19971/14/19971/14/1997 12:00:00 AM PART
2nd phone call from owner to cell phone @ $.45/min
BLD1056363 INSP - Conference1/14/19971/14/19971/14/1997 12:00:00 AM PASS
still working on this project
BLD96-00252 INSP - Conference1/14/19971/14/19971/14/1997 12:00:00 AMAPASS
faving engineer's report
BLD96-00252 INSP - Foundation1/13/19971/14/19971/14/1997 12:00:00 AMAPART
engineer's stamped change to be faxed to Building Dept
BLD96-00252 INSP - Masonry1/14/19971/14/19971/14/1997 12:00:00 AMAPASS
2nd lift, special inspector on site, hairpins changed, Engineer to address. 1/4" clearance ok (as per engineer)
BLD96-02701 INSP - Framing/Rough-in1/13/19971/14/19971/14/1997 12:00:00 AMAFAIL
truss brace, stair rise varies 7" to 8", hgr missing, eng req'd for tji's utilized for lateral restraint of basement wall, place clips on posts as per plan, transfer pt lds, dbl joists as req'd
BLD96-02897 INSP - Framing/Rough-in1/14/19971/14/19971/14/1997 12:00:00 AMAFAIL
covered w/o inspection, cut trusses, need eng fix and access
BLD96-03020 INSP - Energy code compliance1/13/19971/14/19971/14/1997 12:00:00 AMAPASS
in process of doing skylight and will finish when they do blow in, removed undated green tag....no blue tag posted. posted green tag
BLD96-03311 INSP - Footings1/13/19971/14/19971/14/1997 12:00:00 AMACANC
given to Carl
MEC97-00077 INSP - Rough-in & Gas Pressure1/14/19971/14/19971/14/1997 12:00:00 AMPPASS
BLD96-01913 INSP - Final1/14/19971/14/19971/14/1997 12:00:00 AMPNR
BLD96-02016 INSP - Foundation1/14/19971/14/19971/14/1997 12:00:00 AMPNR
rebar for walls
BLD96-02360 INSP - Framing/Rough-in1/14/19971/14/19971/14/1997 12:00:00 AMPFAIL
transfer pt lds, brace truss as per eng, blk tji's w/ld brng above