PLM01-01840
| Plumbing Rough-in | 1/11/2002 | 1/14/2002 | 1/14/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 11:52:07. Contact: ###-####.confefence 1/14/2002 10:38:15 PM
|
PLM02-00085
| Water and/or Sewer | 1/11/2002 | 1/14/2002 | 1/14/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-04003
| Final | 1/12/2002 | 1/14/2002 | 1/14/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/12/2002 at 12:25:21. Contact: ###-####.
|
PLM02-00092
| Final | 1/14/2002 | 1/14/2002 | 1/14/2002 12:00:00 AM | P | PASS |
|
|
fn tom --###-#### polybutal repipe replaced with cpvc 1/15/2002 2:08:01 AM
|