FIR01-00427
| INSP-Supply line flush | 1/11/2002 | 1/14/2002 | 1/15/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 409 On 1/11/2002 2:15:53 PM received a call from Dan with Shilo. He said the other underground supplies were flushed and they produced a lot more water than this one and they will proceed with other trouble shooting to determine why this flush is so low on flow 1/15/2002 11:50:37 AM
|
FIR01-00532
| FIR-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 12:00:00 AM | | NR |
|
|
wip 1/14/2002 7:20:43 AM
|
FIR01-00323
| INSP-Sprinkler Rough-in/Hydro | 1/11/2002 | 1/14/2002 | 1/14/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 08:46:41. Contact: ###-####. hydro tests on sub, basement, ground, third and fourth floors only - okay 1/14/2002 1:36:14 PM
|
BLD01-02622
| FIRE-Final Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
FIR01-00562
| INSP-Sprinkler Rough-in/Hydro | 1/14/2002 | 1/14/2002 | 1/14/2002 12:00:00 AM | P | PART |
|
|
for under ground mike-- ###-#### underground hydro complete; flush will occur at future date when drains are ready 1/14/2002 2:15:56 PM
|
FIR02-00005
| INSP-Sprinkler Rough-in | 1/14/2002 | 1/14/2002 | 1/14/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 409 On 1/14/2002 2:14:54 PM checked hangers in basement and retaining straps are installed where fireproofing is going to be applied this week.
|