Inspections for the day of: Tuesday, January 14, 2003.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00810 BLD-Aging Inspection1/14/20031/14/20031/14/2003 12:00:00 AM DONE
complet with out insp. 106.4.4 1/14/2003 7:28:06 AM
BLD02-00813 BLD-Aging Inspection1/14/20031/14/20031/14/2003 12:00:00 AM DONE
conplet with out insp 106.4.4 1/14/2003 7:28:31 AM
BLD01-00623 BLD-Aging Inspection1/14/20031/14/20031/14/2003 12:00:00 AM PASS
sign off card being faxed . final ok 1/14/2003 9:19:39 AM 1/14/2003 9:20:20 AM
MEC03-00091 Pressure Test1/14/20031/14/20031/14/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/14/2003 at 07:19:43. Contact: ###-####. pt ok 1/14/2003 10:31:36 AM
MEC02-01843 Rough-in1/13/20031/14/20031/14/2003 12:00:00 AMAPASS
TED ###-####
MEC02-01843 Final1/13/20031/14/20031/14/2003 12:00:00 AMAPASS
TED ###-####
BLD02-03015 BLD-Framing/Rough-in1/13/20031/14/20031/14/2003 12:00:00 AMAPART
VICK FOR COVER; Phone #: ###-#### Internet Inspection Request from: Darla Downs exterior ok for cover. 1/14/2003 9:51:49 AM
MEC03-00110 Conference1/13/20031/14/20031/14/2003 12:00:00 AMAPASS
mike ###-####
BLD02-03094 BLD-Foundation1/13/20031/14/20031/14/2003 12:00:00 AMPPART
jay; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie placed with out insp. ok per directors policy . 1/14/2003 4:13:40 PM
BLD02-02449 BLD-Final1/13/20031/14/20031/14/2003 12:00:00 AMPFAIL
###-#### access code 193 20 min fire door under stair at garage/ landing at back door. 1/14/2003 4:31:50 PM
BLD02-00777 BLD-Conference1/9/20031/14/20031/14/2003 12:00:00 AMPPASS
TODD ###-#### TODD ###-#### wip ele 1/14/2003 2:33:57 PM
BLD02-02672 BLD-Framing/Rough-in1/14/20031/14/20031/14/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/14/2003 at 08:27:13. Contact: ###-####.entry hold down and studs at garage sheer pannels the rest of the bldg. ok to side/ ele boxes at tv cable/ chenal framing insulated/fire blk mech chase/trusses to8 missing laderal brace. 1/14/2003 3:38:26 PM
BLD02-02013 BLD-Final1/14/20031/14/20031/14/2003 12:00:00 AMPPASS
###-#### justin key on top of front door light
BLD02-02113 BLD-Final1/14/20031/14/20031/14/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/14/2003 at 10:47:20. Contact: ###-####. c/n made ok 1/14/2003 4:04:00 PM
BLD02-01603 BLD-Final1/14/20031/14/20031/14/2003 12:00:00 AMPPASS
troy ###-####
MEC02-03094 Final1/14/20031/14/20031/14/2003 12:00:00 AMPPASS
final ok c/n made ok at framing insp. as noted.