Inspections for the day of: Tuesday, January 14, 2003.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-03181 Final1/13/20031/14/20031/14/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/13/2003 at 11:36:00. Contact: ###-####. still leaking under the shower 1/14/2003 11:16:11 AM
PLM03-00092 Plumbing Rough-in1/13/20031/14/20031/14/2003 12:00:00 AMAPASS
###-#### ri ok 1/14/2003 9:22:59 AM
PLM03-00096 Plumbing Rough-in1/13/20031/14/20031/14/2003 12:00:00 AMAFAIL
rob -###-#### test ok, just needs to move a vtr behind the garage that is with in 10' of an openable window upstairs. 1/14/2003 10:45:41 AM
PLM02-03618 Final1/13/20031/14/20031/14/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/13/2003 at 19:28:12. Contact: ###-####. final ok 1/14/2003 8:58:54 AM
PLM03-00030 Plumbing Rough-in1/13/20031/14/20031/14/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/13/2003 at 19:29:07. Contact: ###-####. ri ok 1/14/2003 9:36:56 AM
PLM02-03364 Final1/14/20031/14/20031/14/2003 12:00:00 AMPPASS
###-#### ashley-- gar door code 4055 final ok 1/14/2003 2:10:02 PM
PLM03-00099 Water and/or Sewer1/14/20031/14/20031/14/2003 12:00:00 AMPPASS
greg ###-#### sw final ok 1/14/2003 11:26:19 AM
PLM03-00100 Plumbing Rough-in1/14/20031/14/20031/14/2003 12:00:00 AMPPASS
j d ###-#### ri ok 1/14/2003 1:57:39 PM
PLM02-03720 Final1/14/20031/14/20031/14/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/14/2003 at 10:13:22. Contact: ###-####. final ok 1/14/2003 1:44:49 PM
PLM02-03550 Plumbing Rough-in1/13/20031/14/20031/14/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/13/2003 at 16:18:51. Contact: ###-####. new kitchen sink waste is over 42", replace waste arm with 2", use a brass fitting at copper/galv connections. complete waste and vent system. turn on water when complete. 1/14/2003 2:49:32 PM
PLM02-03550 Plumbing Rough-in1/10/20031/14/20031/13/2003 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 01/10/2003 at 16:42:21. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/13/2003 at 10:00:55.