Inspections for the day of: Friday, January 14, 2005.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM04-03833 Final1/13/20051/14/20051/14/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/13/2005 at 2:00:13 PM. Contact: ###-####.final ok 1/13/2005 2:29:43 PM
PLM05-00046 Plumbing Rough-in1/13/20051/14/20051/14/2005 12:00:00 AMAPASS
andy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ri ok bathroom moved 4' to the south to allow room under stairs for door to riser room. 1/14/2005 10:48:17 AM
PLM05-00041 Plumbing Rough-in1/13/20051/14/20051/14/2005 12:00:00 AMAFAIL
unit c; Phone #: ###-#### Internet Inspection Request from: Dennis White 6" clearance between pex and recessed light fixture horizontaly, min. 1/14/2005 9:13:17 AM
PLM05-00042 Plumbing Rough-in1/13/20051/14/20051/14/2005 12:00:00 AMAFAIL
unit d; Phone #: ###-#### Internet Inspection Request from: Dennis White 6" horizontal crearance between recessed light fixture and pex piping min. 1/14/2005 9:17:09 AM
PLM04-03031 Plumbing Rough-in1/14/20051/14/20051/14/2005 12:00:00 AMPFAIL
Phone #: ###-#### Internet Inspection Request from: Sonja Hankel move 2nd floor shower trap back inside house, move 2nd floor lav water to face of wall, needs 1 1/4" thru water softenor. 30 fu max on 1". 1/14/2005 3:48:21 PM
PLM04-03587 Final1/14/20051/14/20051/14/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 1/14/2005 at 10:11:21 AM. Contact: ###-####. final ok 1/14/2005 2:19:32 PM