FIR08-00270
| INSP-Sprinkler Rough-in/Hydro | 1/14/2009 | 1/14/2009 | 1/14/2009 5:55:58 PM | A | PART |
|
|
Rough-in passed
|
FIR06-00226
| INSP-Sprinkler Rough-in/Hydro | 1/14/2009 | 1/14/2009 | 1/14/2009 5:44:33 PM | A | PART |
|
|
UG hydro and flush passed
|
BLD06-03634
| FIRE-Conference | 1/14/2009 | 1/14/2009 | 1/14/2009 5:40:12 PM | P | DONE |
|
|
Regarding project related fire sprinkler permit work finals.
|
FIR07-00801
| INSP-Final Inspection | 1/14/2009 | 1/14/2009 | 1/14/2009 5:38:25 PM | P | PART |
|
|
Permit finaled.
|
FIR08-00860
| INSP-Sprinkler Rough-in | 1/14/2009 | 1/14/2009 | 1/14/2009 5:35:14 PM | P | FAIL |
|
|
See approved plans for locations okay to cover, also annotated two areas in need of adjustments in coverage due to spacing deficiencies.
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 1/13/2009 | 1/14/2009 | 1/14/2009 5:32:39 PM | A | PART |
|
|
5th floor corridor drop ceilings are okay for cover, noted two accessible cable closets adjacent to the elevators without sprinkler protection.
|
FIR08-00669
| INSP-Final Inspection | 1/13/2009 | 1/14/2009 | 1/13/2009 4:57:43 PM | P | CANC |
|
|
Dannie Jackson Phone #: ###-#### Internet Inspection Request from: Diane Turner Inspection cancelled from web by: Diane Turner
|