FIR08-00830
| INSP-Sprinkler Rough-in | 1/14/2009 | 1/14/2009 | 1/14/2009 4:23:28 PM | P | DONE |
|
|
This was a conference. Bill the fitter is going to re-position the sidewall heads that are located in the closet so that the water will not be blocked by items being stored. I stated that I would not require resubmittals for this but would require resubmittals for the branchline relocations and re-routing of piping that may be required to avoid routing pipe in the exterior walls.
|
BLD08-00234
| FIRE-Final Inspection | 1/13/2009 | 1/14/2009 | 1/14/2009 4:20:32 PM | A | FAIL |
|
|
Need the project related fire alarm permit finaled. Need approved hardware installed on the pocket doors, approved hardware on the south exit door and the east exit door. Need the exit discharge light repaired at the main north exit. Curbing needs painted for fire dept access. One additional fire extinguisher is needed in the second floor corridor.
|
FIR08-00632
| INSP-Final Inspection | 1/13/2009 | 1/14/2009 | 1/14/2009 4:18:27 PM | A | FAIL |
|
|
Just need the elevator interconnects with the facp to be tested.
|
FIR09-00006
| INSP-Final Inspection | 1/13/2009 | 1/14/2009 | 1/14/2009 4:17:30 PM | A | PASS |
|
|
Permit finaled
|
FIR09-00007
| INSP-Final Inspection | 1/13/2009 | 1/14/2009 | 1/14/2009 4:16:17 PM | A | PASS |
|
|
Permit finaled
|