Inspections for the day of: Wednesday, January 14, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00814 General Inspection1/14/20091/14/20091/14/2009 5:52:35 PMPFAIL
Verbal correction to RP:
Clean up all hard surfaces of any sediment and debris on a daily basis.
Will re-inspect on 1/16/09 PM
ESC08-00736 General Inspection1/14/20091/14/20091/14/2009 5:52:06 PMPFAIL
Verbal correction to RP:
Clean up all hard surfaces of any sediment and debris on a daily basis.
Will re-inspect on 1/16/09 PM
ESC08-00737 Tracking Control1/12/20091/14/20091/14/2009 5:50:34 PMAFAIL
(Via phona call to RP)
Notice of Correction:
1. Clean all sediment and debris off of all hard surfaces at project lot and to the west to the half court.
2. Clean up concrete washout spoil pile on lot to the west and provide a concrete washout pit for any further concrete pours.
Will re-inspect on 1/20/08 PM
ESC08-00490 BMP Violation1/12/20091/14/20091/14/2009 5:14:08 PMAFAIL
Verbal to RP:
Prior to last inspection, the only issue corrected was storm drains were maintained and cleaned.
Told the RP to clean up the perimeter sidewallk and gutterpan of all sediment and debris. Also to sweep up the area at the south eaast end of project where the is heavy amounts of sediment. Will re-inspect on 1/20/09
ESC08-00788 BMP Violation1/13/20091/14/20091/14/2009 2:15:22 PMAFAIL
Verbal to RP:
Met with RP over site and conditions. Told him to mantain the construction entrance when needed. Also to Maintain both storm drains at the north end of Business Way & Gowen Rd. Keep working on the valley gutter to relieve the muddy sediment as much as possible. If they choose to work in these saturated conditions they wil need to follow these step to stay compliant. Will re-inspect on 1/20/09 AM
ESC08-00790 BMP Violation1/13/20091/14/20091/14/2009 2:15:10 PMAFAIL
Verbal to RP:
Met with RP over site and conditions. Told him to mantain the construction entrance when needed. Also to Maintain both storm drains at the north end of Business Way & Gowen Rd. Keep working on the valley gutter to relieve the muddy sediment as much as possible. If they choose to work in these saturated conditions they wil need to follow these step to stay compliant. Will re-inspect on 1/20/09 AM
ESC08-00789 BMP Violation1/13/20091/14/20091/14/2009 2:14:08 PMAFAIL
Verbal to RP:
Met with RP over site and conditions. Told him to mantain the construction entrance when needed. Also to Maintain both storm drains at the north end of Business Way & Gowen Rd. Keep working on the valley gutter to relieve the muddy sediment as much as possible. If they choose to work in these saturated conditions they wil need to follow these step to stay compliant. Will re-inspect on 1/20/09 AM
ESC08-00994 Site Preparation1/14/20091/14/20091/14/2009 1:46:46 PM PART

Need to move the ESC sign to the entrance of the project area off of Ann Morrison. Left a message with the RP.
ESC08-00491 Tracking Control1/14/20091/14/20091/14/2009 1:45:32 PMAFAIL
Notice to RP and Jeff the PM)
Correction Notice:
Clean all tracking off of the Right-A-Away.
Use the MEP to achieve the miniumizing of track off of the project area.
Failure to comply will result in further enforcement. Which may result in a stop work order. Will re-inspect on 1/20/09
ESC08-00491 Tracking Control1/14/20091/14/20091/14/2009 1:30:43 PMACANC
Duplicate.
ESC08-00655 Site Final1/14/20091/14/20091/14/2009 8:21:00 AMAPASS
The verical construction has begun.