BLD09-01574
| FIRE-Final Inspection | 1/14/2011 | 1/14/2011 | 1/14/2011 4:03:38 PM | P | PASS |
|
|
Scope of rack permit work passed life safety per inspector 410.
|
BLD10-02754
| FIRE-Final Inspection | 1/14/2011 | 1/14/2011 | 1/14/2011 4:00:04 PM | P | PASS |
|
|
Field verified noted corrections are finished. Fire life safety finaled per inspector 410.
|
BLD10-02754
| FIRE-Final Inspection | 1/14/2011 | 1/14/2011 | 1/14/2011 3:57:53 PM | P | FAIL |
|
|
Final pending current certification for the existing hood suppression system and K class extinguisher per inspector 410.
|
BLD10-02570
| FIRE-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 3:56:14 PM | A | PASS |
|
|
Fire life safety finaled per inspector 410.
|
FIR10-00576
| INSP-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 3:55:21 PM | A | PASS |
|
|
Fire sprinkler permit final approved per inspector 410.
|
FIR11-00002
| INSP-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 3:54:14 PM | A | PASS |
|
|
Scope of fire sprinkler work passed both rough-in and final inspections. Permit final okay per inspector 410.
|
FIR10-00631
| INSP-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 3:52:24 PM | A | PART |
|
|
Items needed for final include: repair ground fault, provide building address for offsite account information, post knox box, post points/zone map at the panel, install covers at tamper switch junction boxes and flow switch, label breaker for FACP. Per inspector 410.
|
FIR10-00425
| INSP-Sprinkler Rough-in/Hydro | 1/13/2011 | 1/14/2011 | 1/14/2011 3:51:52 PM | A | PART |
|
|
Overhead hydrostatic test completed satisfactory per inspector 410.
|
FIR10-00514
| INSP-Conference | 1/13/2011 | 1/14/2011 | 1/14/2011 3:37:21 PM | A | DONE |
|
|
Jeff and I met and discussed the combustible concealed space/soffit that encircles the entire building. This space will need to meet NFPA 13 Chapter 8 requirements such as sprinkler protection or filled with non-combustible insulation.
|
BLD09-01711
| FIRE-Conference | 1/14/2011 | 1/14/2011 | 1/14/2011 3:12:20 PM | P | DONE |
|
|
Prior to life safety sign off the electric alarm bell, for the fire sprinkler system, will be required to be relocated and installed at the new FDC location. The general contractor was not on site to address this issue with.
|
BLD10-02941
| FIRE-Conference | 1/13/2011 | 1/14/2011 | 1/14/2011 3:05:41 PM | A | DONE |
|
|
I went over life safety requirements with Jennifer
|
BLD10-02683
| FIRE-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 3:02:57 PM | P | PART |
|
|
A temporary occupancy was given until the AES panel is submitted for, inspected and approved. All other life safety items are passed.
|
BLD10-02793
| FIRE-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 3:00:05 PM | P | PART |
|
|
A temporary occupancy was given until the AES panel is submitted for, inspected and approved. All other life safety items are passed.
|
FIR11-00020
| INSP-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 2:37:53 PM | A | PASS |
|
|
permit finaled
|
BLD10-02950
| FIRE-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 1:47:30 PM | A | FAIL |
|
|
Repair and test the exit signs/emergency lights. Provide annual inspection for all fire extinguishers. Remove the dead bolts from the rear exit door. Install door 104A with hardware for inspection.
|
FIR10-00144
| INSP-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 1:43:35 PM | P | FAIL |
|
|
The smoke detector located in Mech. 144 exceeds 3' from the peak and it exceeds 12" from the deck. The smoke detectors in room 139, 138 and 146 exceeds 21' from the room corners. Strobes are overspaced in rooms 138, 146 and 147. Add a detector in the Gas 149 room as per the approved plans. A heat detector could be used instead of a smoke detector due to environmental reasons. All detectors shall be located no less than 3' from supply and return openings. Provide testing for all remaining devices.
|
FIR10-00655
| INSP-Sprinkler Rough-in | 1/14/2011 | 1/14/2011 | 1/14/2011 11:38:34 AM | P | PASS |
|
|
The sprinkler rough-in is passed but a re-inspection will be needed for the tenting. Sprinklers are not to be covered until the tenting has been inspected.
|
FIR10-00094
| INSP-Final Inspection | 1/14/2011 | 1/14/2011 | 1/14/2011 11:36:02 AM | P | PASS |
|
|
Permit finaled
|
FIR10-00028
| INSP-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 11:35:01 AM | A | PASS |
|
|
permit finaled.
|
BLD10-02686
| FIRE-Final Inspection | 1/13/2011 | 1/14/2011 | 1/14/2011 9:49:56 AM | A | PASS |
|
|
Life safety passed.
|