Inspections for the day of: Friday, January 14, 2011.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01574 FIRE-Final Inspection1/14/20111/14/20111/14/2011 4:03:38 PMPPASS
Scope of rack permit work passed life safety per inspector 410.
BLD10-02754 FIRE-Final Inspection1/14/20111/14/20111/14/2011 4:00:04 PMPPASS
Field verified noted corrections are finished. Fire life safety finaled per inspector 410.
BLD10-02754 FIRE-Final Inspection1/14/20111/14/20111/14/2011 3:57:53 PMPFAIL
Final pending current certification for the existing hood suppression system and K class extinguisher per inspector 410.
BLD10-02570 FIRE-Final Inspection1/13/20111/14/20111/14/2011 3:56:14 PMAPASS
Fire life safety finaled per inspector 410.
FIR10-00576 INSP-Final Inspection1/13/20111/14/20111/14/2011 3:55:21 PMAPASS
Fire sprinkler permit final approved per inspector 410.
FIR11-00002 INSP-Final Inspection1/13/20111/14/20111/14/2011 3:54:14 PMAPASS
Scope of fire sprinkler work passed both rough-in and final inspections. Permit final okay per inspector 410.
FIR10-00631 INSP-Final Inspection1/13/20111/14/20111/14/2011 3:52:24 PMAPART
Items needed for final include: repair ground fault, provide building address for offsite account information, post knox box, post points/zone map at the panel, install covers at tamper switch junction boxes and flow switch, label breaker for FACP. Per inspector 410.
FIR10-00425 INSP-Sprinkler Rough-in/Hydro1/13/20111/14/20111/14/2011 3:51:52 PMAPART
Overhead hydrostatic test completed satisfactory per inspector 410.
FIR10-00514 INSP-Conference1/13/20111/14/20111/14/2011 3:37:21 PMADONE
Jeff and I met and discussed the combustible concealed space/soffit that encircles the entire building. This space will need to meet NFPA 13 Chapter 8 requirements such as sprinkler protection or filled with non-combustible insulation.
BLD09-01711 FIRE-Conference1/14/20111/14/20111/14/2011 3:12:20 PMPDONE
Prior to life safety sign off the electric alarm bell, for the fire sprinkler system, will be required to be relocated and installed at the new FDC location. The general contractor was not on site to address this issue with.
BLD10-02941 FIRE-Conference1/13/20111/14/20111/14/2011 3:05:41 PMADONE
I went over life safety requirements with Jennifer
BLD10-02683 FIRE-Final Inspection1/13/20111/14/20111/14/2011 3:02:57 PMPPART
A temporary occupancy was given until the AES panel is submitted for, inspected and approved. All other life safety items are passed.
BLD10-02793 FIRE-Final Inspection1/13/20111/14/20111/14/2011 3:00:05 PMPPART
A temporary occupancy was given until the AES panel is submitted for, inspected and approved. All other life safety items are passed.
FIR11-00020 INSP-Final Inspection1/13/20111/14/20111/14/2011 2:37:53 PMAPASS
permit finaled
BLD10-02950 FIRE-Final Inspection1/13/20111/14/20111/14/2011 1:47:30 PMAFAIL
Repair and test the exit signs/emergency lights. Provide annual inspection for all fire extinguishers. Remove the dead bolts from the rear exit door. Install door 104A with hardware for inspection.
FIR10-00144 INSP-Final Inspection1/13/20111/14/20111/14/2011 1:43:35 PMPFAIL
The smoke detector located in Mech. 144 exceeds 3' from the peak and it exceeds 12" from the deck. The smoke detectors in room 139, 138 and 146 exceeds 21' from the room corners. Strobes are overspaced in rooms 138, 146 and 147. Add a detector in the Gas 149 room as per the approved plans. A heat detector could be used instead of a smoke detector due to environmental reasons. All detectors shall be located no less than 3' from supply and return openings. Provide testing for all remaining devices.
FIR10-00655 INSP-Sprinkler Rough-in1/14/20111/14/20111/14/2011 11:38:34 AMPPASS
The sprinkler rough-in is passed but a re-inspection will be needed for the tenting. Sprinklers are not to be covered until the tenting has been inspected.
FIR10-00094 INSP-Final Inspection1/14/20111/14/20111/14/2011 11:36:02 AMPPASS
Permit finaled
FIR10-00028 INSP-Final Inspection1/13/20111/14/20111/14/2011 11:35:01 AMAPASS
permit finaled.
BLD10-02686 FIRE-Final Inspection1/13/20111/14/20111/14/2011 9:49:56 AMAPASS
Life safety passed.