FIR12-00689
| FIR-Aging Inspection | 1/14/2014 | 1/14/2014 | 1/15/2014 5:38:02 PM | | DEFR |
|
|
|
BLD13-00903
| FIRE-Final Inspection | 1/14/2014 | 1/14/2014 | 1/15/2014 5:37:27 PM | P | NR |
|
|
Fire Life Saftey final with Dave H. Requested by Roger W. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD13-01236
| FIRE-Final Inspection | 1/14/2014 | 1/14/2014 | 1/15/2014 5:36:46 PM | P | NR |
|
|
Request for Fire Life Saftey walk by Roger W. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD13-03104
| FIRE-Conference | 1/13/2014 | 1/14/2014 | 1/14/2014 4:20:59 PM | A | DONE |
|
|
On site conference regarding life safety inspection items and plan review notes.
|
FIR13-00609
| INSP-Final Inspection | 1/13/2014 | 1/14/2014 | 1/14/2014 2:03:40 PM | P | PASS |
|
|
Final walkthrough completed satisfactory. Note* missing "wheel" handle at the wall post indicator to be provided prior to building final.
|
FIR13-00579
| INSP-Sprinkler Rough-in/Hydro | 1/13/2014 | 1/14/2014 | 1/14/2014 1:59:18 PM | A | PART |
|
|
Completed hydrostatic testing for the 3rd floor west wing units and corridor.
|