Inspections for the day of: Tuesday, January 14, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-04865 Final1/13/20201/14/20201/14/2020 2:23:59 PMPCANC
Please schedule with homeowner Kathy ###-#### Phone #: ###-#### Inspection requested via web by Emmet Bushman...
rescheduled to next day at 11:15AM
ELE19-04491 Final1/14/20201/14/20201/14/2020 2:09:24 PMPFAIL
Please call miguel Phone #: ###-#### Inspection requested via web by Greg Traudt...
1) light in downstairs bedroom closet to closde to shelf...410.2, 410.12
ELE19-03951 Permanent Service1/13/20201/14/20201/14/2020 1:26:12 PMPPASS
Afternoon inspection for service change so Idaho Power can hook back up Phone #: ###-#### Inspection requested via web by Ryan Schaffer...
p/s u/g reconnect ok
ELE19-03434 Final1/14/20201/14/20201/14/2020 12:48:11 PMPPASS
Ill Be Ready By Noon or So Thanks So Much And Be Safe Phone #: ###-#### Inspection requested via web by jason shifflett...ok to final
ELE20-00080 Electrical Rough-In1/12/20201/14/20201/14/2020 11:57:45 AMPPASS
Phone #: ###-#### Inspection requested via web by Chris Husted...
rough ok to cover..
contractor will added 20A outlet for garage, outlet dwnstairs hallway, and outlets within 24" of sink-one on each side by final...contractor has been notified as well as homeowner/builder
ELE19-04859 Electrical Rough-In1/14/20201/14/20201/14/2020 10:41:46 AMAPASS
Can Inspector please call Randy Head of Project before heading over to job so he can meet with you at project ###-#### Thank you Phone #: ###-#### Inspection requested via web by Charles Davis...
ok to cover or leave covered...bedroom, living, and kitchen...work already done....
contractor taking responsibility of work....
future work in basement adding bathroom
ELE19-04859 Final1/13/20201/14/20201/14/2020 10:40:33 AMACANC
Can Inspector please call Randy Head of Project before heading over to job so he can meet with you at project ###-#### Thank you Phone #: ###-#### Inspection requested via web by Charles Davis...changed to rough in
ELE20-00140 Electrical Rough-In1/13/20201/14/20201/14/2020 9:53:41 AMAPASS
kitchen/nook remodel.
lock box code is 8791 Phone #: ###-#### Inspection requested via web by Barbara Szurgot...
ok to cover
new pony wall dividing kitchen/living
new wall for switches
new outlet right of range
ELE20-00144 Electrical Rough-In1/13/20201/14/20201/14/2020 9:44:01 AMAPASS
Rough-in for basement living room. 11 lights, three switches, and 7 receptacles. Call Wyatt with any questions. Thanks. Phone #: ###-#### Inspection requested via web by Dan Hilke...
new furred out walls in basement and LED can lights in ceiling...ok to cover
ELE19-03628 Final1/13/20201/14/20201/14/2020 9:04:53 AMAFAIL
Kenny Williams is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...

1) panel shall be legiblyidentified to it's clear, evident, and specific purpose or use..408.4

2) sch80 PVC shall be used where exposed to physical damage..at panel above ground...352.10(F)
ELE20-00041 Permanent Service1/14/20201/14/20201/14/2020 8:31:03 AMAPASS
energize service only, bob ###-#### Phone #: ###-#### Inspection requested via web by Dale Johnson...
p/s o/h ok to relocate to new location