ELE19-04865
| Final | 1/13/2020 | 1/14/2020 | 1/14/2020 2:23:59 PM | P | CANC |
|
|
Please schedule with homeowner Kathy ###-#### Phone #: ###-#### Inspection requested via web by Emmet Bushman... rescheduled to next day at 11:15AM
|
ELE19-04491
| Final | 1/14/2020 | 1/14/2020 | 1/14/2020 2:09:24 PM | P | FAIL |
|
|
Please call miguel Phone #: ###-#### Inspection requested via web by Greg Traudt... 1) light in downstairs bedroom closet to closde to shelf...410.2, 410.12
|
ELE19-03951
| Permanent Service | 1/13/2020 | 1/14/2020 | 1/14/2020 1:26:12 PM | P | PASS |
|
|
Afternoon inspection for service change so Idaho Power can hook back up Phone #: ###-#### Inspection requested via web by Ryan Schaffer... p/s u/g reconnect ok
|
ELE19-03434
| Final | 1/14/2020 | 1/14/2020 | 1/14/2020 12:48:11 PM | P | PASS |
|
|
Ill Be Ready By Noon or So Thanks So Much And Be Safe Phone #: ###-#### Inspection requested via web by jason shifflett...ok to final
|
ELE20-00080
| Electrical Rough-In | 1/12/2020 | 1/14/2020 | 1/14/2020 11:57:45 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Husted... rough ok to cover.. contractor will added 20A outlet for garage, outlet dwnstairs hallway, and outlets within 24" of sink-one on each side by final...contractor has been notified as well as homeowner/builder
|
ELE19-04859
| Electrical Rough-In | 1/14/2020 | 1/14/2020 | 1/14/2020 10:41:46 AM | A | PASS |
|
|
Can Inspector please call Randy Head of Project before heading over to job so he can meet with you at project ###-#### Thank you Phone #: ###-#### Inspection requested via web by Charles Davis... ok to cover or leave covered...bedroom, living, and kitchen...work already done.... contractor taking responsibility of work.... future work in basement adding bathroom
|
ELE19-04859
| Final | 1/13/2020 | 1/14/2020 | 1/14/2020 10:40:33 AM | A | CANC |
|
|
Can Inspector please call Randy Head of Project before heading over to job so he can meet with you at project ###-#### Thank you Phone #: ###-#### Inspection requested via web by Charles Davis...changed to rough in
|
ELE20-00140
| Electrical Rough-In | 1/13/2020 | 1/14/2020 | 1/14/2020 9:53:41 AM | A | PASS |
|
|
kitchen/nook remodel. lock box code is 8791 Phone #: ###-#### Inspection requested via web by Barbara Szurgot... ok to cover new pony wall dividing kitchen/living new wall for switches new outlet right of range
|
ELE20-00144
| Electrical Rough-In | 1/13/2020 | 1/14/2020 | 1/14/2020 9:44:01 AM | A | PASS |
|
|
Rough-in for basement living room. 11 lights, three switches, and 7 receptacles. Call Wyatt with any questions. Thanks. Phone #: ###-#### Inspection requested via web by Dan Hilke... new furred out walls in basement and LED can lights in ceiling...ok to cover
|
ELE19-03628
| Final | 1/13/2020 | 1/14/2020 | 1/14/2020 9:04:53 AM | A | FAIL |
|
|
Kenny Williams is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...
1) panel shall be legiblyidentified to it's clear, evident, and specific purpose or use..408.4
2) sch80 PVC shall be used where exposed to physical damage..at panel above ground...352.10(F)
|
ELE20-00041
| Permanent Service | 1/14/2020 | 1/14/2020 | 1/14/2020 8:31:03 AM | A | PASS |
|
|
energize service only, bob ###-#### Phone #: ###-#### Inspection requested via web by Dale Johnson... p/s o/h ok to relocate to new location
|