Inspections for the day of: Thursday, January 15, 2004.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC03-01060 Final1/14/20041/15/20041/15/2004 12:00:00 AMANR
###-#### KENNY INSPECTION IS FOR HYDRONIC HEAT LINES
MEC03-03323 Final1/14/20041/15/20041/15/2004 12:00:00 AMAPASS
adam; Phone #: ###-#### Internet Inspection Request from: Annette Moore
MEC03-02790 Final1/14/20041/15/20041/15/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 1/14/2004 at 2:19:38 PM. Contact: ###-####. need 18" clearance at side of gas range..need specs on f/p for mantle clearance 1/15/2004 11:06:43 AM
MEC04-00061 Rough-in1/15/20041/15/20041/15/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/15/2004 at 7:10:33 AM. Contact: ###-####.
MEC04-00060 Rough-in1/14/20041/15/20041/15/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/14/2004 at 7:51:45 AM. Contact: ###-####.
MEC03-03593 Final1/14/20041/15/20041/15/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 1/14/2004 at 7:53:41 AM. Contact: ###-####.
MEC04-00088 Final1/15/20041/15/20041/15/2004 12:00:00 AMPPASS
PLEASE INSPECT AS CLOSE TO 3:00PM AS POSSIBLE
THANKS
CAROL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
MEC03-03413 Final1/15/20041/15/20041/15/2004 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: CHRISTINA CAINE
MEC04-00113 Rough-in1/15/20041/15/20041/15/2004 12:00:00 AMPNR
mike ###-####
MEC04-00113 Pressure Test1/15/20041/15/20041/15/2004 12:00:00 AMPNR
mike ###-####
MEC03-01060 Pressure Test1/15/20041/15/20041/15/2004 12:00:00 AMPPASS
DON HEADRICK - NEED HYDRONIC INSPECTION; Phone #: ###-#### Internet Inspection Request from: Pam Masselli 100lb test on all hydronic lines ok 1/16/2004 9:41:41 AM