ELE08-00047
| Final | 1/15/2008 | 1/15/2008 | 1/15/2008 3:21:02 PM | P | CANC |
|
|
alan - please call 1/2 hr prior to inspection Phone #: ###-#### called, contractor asked to cancel because general covered ceiling. Said to open up and recall for ri.
|
ELE07-02534
| Final | 1/14/2008 | 1/15/2008 | 1/15/2008 2:25:41 PM | P | FAIL |
|
|
please call 20 min prior to meet//Ouk ###-#### nec 314.25 in completed installations, each box shall have a cover installed, 404.4 switches in wet location shall be enclosed in weatherproof enclosure, met owner, told correction notice
|
ELE07-01738
| Final | 1/15/2008 | 1/15/2008 | 1/15/2008 1:25:56 PM | P | PASS |
|
|
brent Phone #: ###-#### ok to final
|
ELE08-00084
| Conference | 1/14/2008 | 1/15/2008 | 1/15/2008 10:03:12 AM | A | DONE |
|
|
brian Phone #: ###-#### talked about re-wiring parts of house, boxes, stapling, circuits, service requirements to re-connect, circuit to garage, wire sizes for kitchen, j-box accessibility
|
ELE08-00112
| Electrical Rough-In | 1/14/2008 | 1/15/2008 | 1/15/2008 9:53:47 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/14/2008 at 3:02:17 PM. Contact: ###-####. u/g in slab only ok to pour
|